Urmăriți
Emad Elwakil   PhD PE CCP PMP
Titlu
Citat de
Citat de
Anul
A model for predicting failure of oil pipelines
A Senouci, M Elabbasy, E Elwakil, B Abdrabou, T Zayed
Structure and Infrastructure Engineering 10 (3), 375-387, 2014
1272014
Integration of life cycle cost analysis and energy simulation for building energy-efficient strategies assessment
A Hajare, E Elwakil
Sustainable Cities and Society 61, 102293, 2020
912020
Toward urban sustainability and clean potable water: Prediction of water quality via artificial neural networks
T Dawood, E Elwakil, HM Novoa, JFG Delgado
Journal of Cleaner Production 291, 125266, 2021
812021
Artificial intelligence for the modeling of water pipes deterioration mechanisms
T Dawood, E Elwakil, HM Novoa, JFG Delgado
Automation in Construction 120, 103398, 2020
732020
Water pipe failure prediction and risk models: state-of-the-art review
T Dawood, E Elwakil, HM Novoa, JF Gárate Delgado
Canadian Journal of Civil Engineering 47 (10), 1117-1127, 2020
622020
Investigation and modeling of critical success factors in construction organizations
E Elwakil, M Ammar, T Zayed, M Mahmoud, A Eweda, I Mashhour
Construction Research Congress 2009: Building a Sustainable Future, 350-359, 2009
442009
Preliminary modeling of Coronavirus (COVID-19) spread in construction industry.
AM Afkhamiaghd, E Elwakil
Journal of emergency management (Weston, Mass.) 18 (7), 9-17, 2020
432020
Modelling the performance of pavement marking in cold weather conditions
H Fares, K Shahata, E Elwakil, A Eweda, T Zayed, M Abdelrahman, ...
Structure and Infrastructure Engineering 8 (11), 1067-1079, 2012
392012
A review on the factors affecting the use of offsite construction in multifamily housing in the United States
S Gusmao Brissi, L Debs, E Elwakil
Buildings 11 (1), 5, 2020
372020
A framework for performance assessment of organizations in the construction industry
T Zayed, E Elwakil, M Ammar
International Journal of Architecture, Engineering and Construction 1 (4 …, 2012
352012
National bridge inventory data-based stochastic modeling for deck condition rating of prestressed concrete bridges
S Hasan, E Elwakil
Practice Periodical on Structural Design and Construction 25 (3), 04020022, 2020
272020
Integrating analytical hierarchy process and regression for assessing construction organizations’ performance
E Elwakil
International Journal of Construction Management 17 (1), 76-88, 2017
272017
A meta-analysis of critical causes of project delay using Spearman’s rank and relative importance index integrated approach
Q Amarkhil, E Elwakil, B Hubbard
Canadian Journal of Civil Engineering 48 (11), 1498-1507, 2021
252021
Modelling the effect of various factors on the condition of pavement marking
E Elwakil, A Eweda, T Zayed
Structure and Infrastructure Engineering 10 (1), 93-105, 2014
252014
Construction productivity fuzzy knowledge base management system
E Elwakil, T Zayed
Canadian Journal of Civil Engineering 45 (5), 329-338, 2018
242018
Soft computing for modeling pipeline risk index under uncertainty
T Dawood, E Elwakil, HM Novoa, JFG Delgado
Engineering Failure Analysis 117, 104949, 2020
202020
Pressure data-driven model for failure prediction of PVC pipelines
T Dawood, E Elwakil, HM Novoa, JFG Delgado
Engineering Failure Analysis 116, 104769, 2020
182020
Stochastic regression deterioration models for superstructure of prestressed concrete bridges in California
S Hasan, E Elwakil
Journal of Structural Integrity and Maintenance 4 (2), 97-108, 2019
172019
Data management for construction processes using fuzzy approach
E El Wakil, T Zayed
Construction Research Congress 2012: Construction Challenges in a Flat World …, 2012
172012
Knowledge discovery based simulation system in construction
E Elwakil
Concordia University, 2011
162011
Sistemul nu poate realiza operația în acest moment. Încercați din nou mai târziu.
Articole 1–20