Urmăriți
Barry Gledson
Barry Gledson
Associate Professor, Construction Project Management, Northumbria University
Adresă de e-mail confirmată pe northumbria.ac.uk - Pagina de pornire
Titlu
Citat de
Citat de
Anul
The adoption of 4D BIM in the UK construction industry: An Innovation Diffusion approach
B Gledson, D Greenwood
Engineering, Construction and Architectural Management 24 (6), 950-967, 2017
1522017
A smart sewer asset information model to enable an ‘Internet of Things’ for operational wastewater management
V Edmondson, M Cerny, M Lim, B Gledson, S Lockley, J Woodward
Automation in Construction 91, 193-205, 2018
1262018
Rapid LEED evaluation performed with BIM based sustainability analysis on a virtual construction project
Z Alwan, D Greenwood, B Gledson
Construction Innovation 15 (2), 134-150, 2015
962015
Surveying the extent and use of 4D BIM in the UK
B Gledson, D Greenwood
Journal of Information Technology in Construction (ITcon) 21, 57-71, 2016
742016
Hybrid project delivery processes observed in constructor BIM innovation adoption
BJ Gledson
Construction Innovation 16 (2), 229-246, 2016
622016
Use of Simulation Through BIM-Enabled Virtual Projects to Enhance Learning and Soft Employability Skills in Architectural Technology Education.
B Gledson, S Dawson
Building Information Modelling, Building Performance, Design and Smart …, 2017
56*2017
Does size matter? Experiences and perspectives of BIM implementation from large and SME construction contractors
B Gledson, D Henry, P Bleanch
1st UK Academic Conference on Building Information Management (BIM) 2012, 97-108, 2012
552012
Towards green building performance evaluation using Asset Information Modelling
Z Alwan, BJ Gledson
Built Environment Project and Asset Management 5 (3), 290-303, 2015
542015
Overview of construction simulation approaches to model construction processes
O Bokor, L Florez, A Osborne, B Gledson
Organization, Technology and Management in Construction: an International …, 2019
442019
Exploring organisational attributes affecting the innovativeness of UK SMEs
B Gledson, C Phoenix
Construction Innovation: Information, Process, Management 17 (2), 224-243, 2017
342017
Enhanced model of the innovation-decision process, for modular-technological-process innovations in construction
B Gledson
Construction Innovation 22 (4), 1085-1103, 2022
272022
Individual Characteristics as Enablers of Construction Employees’ Digital Literacy: An Exploration of Leaders’ Opinions
SL Zulu, AM Saad, B Gledson
Sustainability 15 (2), 1531, 2023
232023
Construction
G Capper, B Gledson, R Humphrey, E Johansen, E Jowsey, M Kirk, ...
Real Estate Concepts: A Handbook, 428, 2014
22*2014
Use of simulation through BIM-enabled Virtual Projects to enhance learning and soft employability skills in Architectural Technology education
B Gledson, S Dawson
2nd International Sustainable Ecological Engineering Design for Society …, 2016
202016
The implementation and use of 4D BIM and Virtual Construction
BJ Gledson, D Greenwood
Proceedings 30th Annual ARCOM Conference 1 (Portsmouth, UK 1-3rd September …, 2014
192014
Understanding technological interoperability through observations of data leakage in Building Information Modelling (BIM) based transactions
KAJ Stapleton, BJ Gledson, Z Alwan
Proceedings of the 32nd eCAADe Conference, 2 (Newcastle Upon Tyne, England …, 2014
182014
Construction Planning Efficiency and Delivery Time Performance: Analysing Failure in Task-Level 'Hit Rates'
B Gledson, D Williams, M Littlemore
Proceedings of the 34th Annual ARCOM Conference, Belfast, UK, 3rd-5th …, 2018
162018
Digital leadership framework to support firm-level digital transformations for Construction 4.0
B Gledson, SL Zulu, AM Saad, H Ponton
Construction Innovation 24 (1), 341-364, 2024
152024
Embodied carbon in commercial office buildings: Lessons learned from Sri Lanka
A Nawarathna, Z Alwan, B Gledson, N Fernando
Journal of Building Engineering 42, 102441, 2021
152021
Benchmarking BIM Levels of Training and Education amongst Construction Management Practitioners
B Gledson, D Hilton, K Rogage
Proceedings of the 32nd Annual ARCOM Conference 1, 353-362, 2016
152016
Sistemul nu poate realiza operația în acest moment. Încercați din nou mai târziu.
Articole 1–20