Maximum likelihood analysis of component reliability using masked system life-test data JS Usher, TJ Hodgson IEEE transactions on reliability 37 (5), 550-555, 2002 | 199 | 2002 |
The effect of process conditions on mechanical properties of laser‐sintered nylon TL Starr, TJ Gornet, JS Usher Rapid Prototyping Journal 17 (6), 418-423, 2011 | 187 | 2011 |
Preventive maintenance and replacement scheduling for repairable and maintainable systems using dynamic programming KS Moghaddam, JS Usher Computers & Industrial Engineering 60 (4), 654-665, 2011 | 165 | 2011 |
Cost optimal preventive maintenance and replacement scheduling JS Usher, AH Kamal, WH Syed IIE transactions 30 (12), 1121-1128, 1998 | 137 | 1998 |
Estimating system and component reliabilities under partial information on cause of failure FM Guess, JS Usher, TJ Hodgson Journal of Statistical Planning and Inference 29 (1-2), 75-85, 1991 | 123 | 1991 |
Bayesian inference for masked system lifetime data B Reiser, I Guttman, DKJ Lin, FM Guess, JS Usher Journal of the Royal Statistical Society Series C: Applied Statistics 44 (1 …, 1995 | 106 | 1995 |
Weibull component reliability-prediction in the presence of masked data JS Usher IEEE Transactions on Reliability 45 (2), 229-232, 1996 | 103 | 1996 |
Economic design of control charts using the Taguchi loss function SM Alexander, MA Dillman, JS Usher, B Damodaran Computers & industrial engineering 28 (3), 671-679, 1995 | 92 | 1995 |
Forecasting freight demand using economic indices JT Fite, G Don Taylor, JS Usher, JR English, JN Roberts International Journal of Physical Distribution & Logistics Management 32 (4 …, 2002 | 87 | 2002 |
Exact maximum likelihood estimation using masked system data DKJ Lin, JS Usher, FM Guess IEEE Transactions on Reliability 42 (4), 631-635, 1993 | 87 | 1993 |
Production planning for remanufactured products GW DePuy, JS Usher, RL Walker, GD Taylor Production Planning and Control 18 (7), 573-583, 2007 | 83 | 2007 |
Sensitivity analysis and comparison of algorithms in preventive maintenance and replacement scheduling optimization models KS Moghaddam, JS Usher Computers & Industrial Engineering 61 (1), 64-75, 2011 | 79 | 2011 |
Dependent masking and system life data analysis: Bayesian inference for two-component systems I Guttman, DKJ Lin, B Reiser, JS Usher Lifetime Data Analysis 1, 87-100, 1995 | 73 | 1995 |
Bayes estimation of component-reliability from masked system-life data DKJ Lin, JS Usher, FM Guess IEEE Transactions on Reliability 45 (2), 233-237, 1996 | 67 | 1996 |
Multi-zone dispatching in truckload trucking GD Taylor, GL Whicker, JS Usher Transportation Research Part E: Logistics and Transportation Review 37 (5 …, 2001 | 60 | 2001 |
A new multi-objective optimization model for preventive maintenance and replacement scheduling of multi-component systems KS Moghaddam, JS Usher Engineering Optimization 43 (7), 701-719, 2011 | 59 | 2011 |
Optimal preventive maintenance and replacement schedules with variable improvement factor KS Moghaddam, JS Usher Journal of Quality in Maintenance Engineering 16 (3), 271-287, 2010 | 58 | 2010 |
An iterative approach for estimating component reliability from masked system life data JS Usher, FM Guess Quality and reliability engineering international 5 (4), 257-261, 1989 | 55 | 1989 |
AGV flow path design and load transfer point location JS Usher, GW Evans, MR Wilhelm Proceedings of the International Industrial Engineering Conference, 174-179, 1988 | 39 | 1988 |
An analysis of intermodal ramp selection methods GD Taylor, F Broadstreet, TS Meinert, JS Usher Transportation Research Part E: Logistics and Transportation Review 38 (2 …, 2002 | 33 | 2002 |