Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression M Attalla, T Hegazy Journal of construction engineering and management 129 (4), 405-411, 2003 | 217 | 2003 |
Project performance control in reconstruction projects R McKim, T Hegazy, M Attalla Journal of construction engineering and management 126 (2), 137-141, 2000 | 216 | 2000 |
Absenteeism, performance and occupant satisfaction with the indoor environment of green Toronto schools MH Issa, JH Rankin, M Attalla, AJ Christian Indoor and Built Environment 20 (5), 511-523, 2011 | 132 | 2011 |
Energy consumption in conventional, energy‐retrofitted and green LEED Toronto schools MH Issa, M Attalla, JH Rankin, AJ Christian Construction Management and Economics 29 (4), 383-395, 2011 | 38 | 2011 |
Two condition indicators for building components based on reactive‐maintenance data T Hegazy, S Singh Ahluwalia, M Attalla Journal of Facilities Management 8 (1), 64-74, 2010 | 30 | 2010 |
In-house delivery of multiple-small reconstruction projects M Attalla, T Hegazy, E Elbeltagi Journal of Management in Engineering 20 (1), 25-31, 2004 | 30 | 2004 |
Detailed analysis of electricity, water, and gas consumption quantities and costs in Toronto’s public schools MH Issa, M Attalla, JH Rankin, AJ Christian Canadian Journal of civil engineering 37 (1), 25-36, 2010 | 29 | 2010 |
MOST‐FIT: Support techniques for inspection and life cycle optimization in building asset management T Hegazy, A Elhakeem, S Singh Ahluwalia, M Attalla Computer‐Aided Civil and Infrastructure Engineering 27 (2), 130-142, 2012 | 26 | 2012 |
Optimizing the scheduling of crew deployments in repetitive construction projects under uncertainty A Hassan, K El-Rayes, M Attalla Engineering, Construction and Architectural Management 28 (6), 1615-1634, 2021 | 17 | 2021 |
Detailed analysis of the construction, operating, maintenance, and rehabilitation costs of green Toronto schools MH Issa, M Attalla, JH Rankin, AJ Christian Journal of Architectural Engineering 19 (1), 1-11, 2013 | 16 | 2013 |
Reconstruction of the building infrastructure: two performance prediction models M Attalla, T Hegazy, R Haas Journal of infrastructure systems 9 (1), 26-34, 2003 | 16 | 2003 |
Multivariate time series and regression models for forecasting annual maintenance costs of EPDM roofing systems M Alashari, K El-Rayes, M Attalla, M Al-Ghzawi Journal of Building Engineering 54, 104618, 2022 | 13 | 2022 |
Ultra mobile computer system for accurate and speedy inspection of buildings T Hegazy, M Attalla, L Hayter, S Penny CD ROM annual conference, CSCE, quebec city, quebec, 2008 | 13 | 2008 |
Delivering projects with quality and safety M Attalla, A Fetaih, T Hegazy, E Elbeltagi 5th Construction Specialty Conference of the Canadian Society for Civil …, 2003 | 13 | 2003 |
Stochastic scheduling optimization of repetitive construction projects to minimize project duration and cost A Hassan, K El-Rayes, M Attalla International Journal of Construction Management 23 (9), 1447-1456, 2023 | 10 | 2023 |
Reconstruction of occupied buildings, project control techniques—A Canadian study R McKim, M Attalla Proc., 1st Int. Conf. on Civil Engineering, 439-453, 1998 | 9 | 1998 |
System of multiple ANNs for online planning of numerous building improvements S Yousefi, T Hegazy, RA Capuruço, M Attalla Journal of construction engineering and management 134 (5), 342-351, 2008 | 8 | 2008 |
Project control techniques, reconstruction of occupied buildings MM Attalla University of Waterloo, 1997 | 4 | 1997 |
Current Policies throughout the Nation for Pedestrian Hybrid Beacon (PHB) Installation SS DeLorenzo, M Jiang, M Attalla FHWA-ICT-19-010, 2019 | 3 | 2019 |
Reconstruction of operating facilities, a model for project management MM Attalla University of Waterloo, 2000 | 3 | 2000 |