Подписаться
Dr. Sagar U. Sapkal
Dr. Sagar U. Sapkal
Professor and Head, Mechanical Engg Dept, Walchand College of Engineering Sangli, Maharashtra, India
Подтвержден адрес электронной почты в домене walchandsangli.ac.in
Название
Процитировано
Процитировано
Год
Optimization of micro EDM drilling process parameters for titanium alloy by rotating electrode
SU Sapkal, PS Jagtap
Procedia Manufacturing 20, 119-126, 2018
662018
A heuristic for no-wait flow shop scheduling
SU Sapkal, D Laha
The International Journal of Advanced Manufacturing Technology 68, 1327-1338, 2013
532013
Production scheduling optimization in foundry using hybrid Particle Swarm Optimization algorithm
LA Bewoor, VC Prakash, SU Sapkal
Procedia Manufacturing 22, 57-64, 2018
522018
Electro discharge machining characteristics of Ti-6Al-4V alloy: A grey relational optimization
MS Mhatre, SU Sapkal, RS Pawade
Procedia Materials Science 5, 2014 - 2022, 2014
452014
Evolutionary hybrid particle swarm optimization algorithm for solving NP-hard no-wait flow shop scheduling problems
LA Bewoor, V Chandra Prakash, SU Sapkal
Algorithms 10 (4), 121, 2017
392017
An improved heuristic to minimize total flow time for scheduling in the m-machine no-wait flow shop
D Laha, SU Sapkal
Computers & Industrial Engineering 67, 36-43, 2014
362014
Comparative evaluation of 3D printed components for deviations in dimensional and geometrical features
SR Gaikwad, NH Pawar, SU Sapkal
Materials Today: Proceedings 59, 297-304, 2022
212022
A penalty-shift-insertion-based algorithm to minimize total flow time in no-wait flow shops
D Laha, JND Gupta, SU Sapkal
Journal of the Operational Research Society 65 (10), 1611-1624, 2014
202014
Comparative Analysis of Metaheuristic Approaches for Makespan Minimization for No Wait Flow Shop Scheduling Problem
LA Bewoor, VC Prakash, SU Sapkal
International Journal of Electrical and Computer Engineering 7 (1), 417-423, 2017
172017
Evolutionary hybrid particle swarm optimization algorithm to minimize makespan to schedule a flow shop with no wait
LA Bewoor, V Chandraprakash, SU Sapkal
Journal of Engineering Science and Technology 14 (2), 609-628, 2019
122019
An efficient heuristic algorithm for m-machine no-wait flow shops
D Laha, SU Sapkal
Proceedings of the International MultiConference of Engineers and Computer …, 2011
122011
Proposed composite similarity metric method for part family formation in reconfigurable manufacturing system
R Shivdas, S Sapkal
The International Journal of Advanced Manufacturing Technology 125 (5), 2535 …, 2023
72023
Multi-objective optimization of MIG welding of aluminum alloy
A Chafekar, S Sapkal
Techno-Societal 2018 2, 523-530, 2020
72020
Optimization of friction drilling process by response surface methodology
A Potdar, S Sapkal
Advanced Engineering Optimization Through Intelligent Techniques: Select …, 2019
72019
Multi-objective optimization of photochemical machining by using GRA
GR Rathod, SU Sapkal, RM Chanmanwar
Materials Today: Proceedings 4 (10), 10830-10835, 2017
72017
Comparative analysis of metaheuristic approaches for m-Machine no wait flow shop scheduling for minimizing total flow time with stochastic input
LA Bewoor, VC Prakash, SU Sapkal
International Journal of Engineering and Technology 8 (6), 3021-3026, 2016
72016
Performance analysis of GA, PSO and JA for determining the optimal parameters in friction drilling process
N Chityal, S Sapkal
Engineering Science and Technology, an International Journal 35, 2022
62022
An improved scheduling heuristic algorithm for no-wait flow shops on total flow time criterion
SU Sapkal, D Laha
Proceedings of the 3rd International Conference on Electronics Computer …, 2011
62011
Application of Multi-attribute Decision Making Methods for Fused Deposition Modelling
SU Sapkal, PH Warule
Sustainability for 3D Printing, 55-75, 2021
42021
Dimensional Variation and Wear Analysis of 3D Printed Pattern for Sand Casting
SU Sapkal, IC Patil, SK Darekar
Smart Innovations Systems and Technologies 174, 461-470, 2020
42020
В данный момент система не может выполнить эту операцию. Повторите попытку позднее.
Статьи 1–20