Подписаться
Ebrahim Asadi-Gangraj
Ebrahim Asadi-Gangraj
Associate Professor of Industrial Engineering; Babol Noshirvani University of Technology
Подтвержден адрес электронной почты в домене nit.ac.ir
Название
Процитировано
Процитировано
Год
Multi-objective Fuzzy Robust Optimization Approach to Sustainable Closed-Loop Supply Chain Network Design
S Nayeri, MM Paydar, E Asadi-Gangraj, S Emami
Computers & Industrial Engineering, 106716, 2020
1842020
Designing a bi-objective multi-echelon robust blood supply chain in a disaster
M Habibi-Kouchaksaraei, MM Paydar, E Asadi-Gangraj
Applied Mathematical Modelling 55, 583-599, 2018
1222018
Scenario-based design of a steel sustainable closed-loop supply chain network considering production technology
M Pourmehdi, MM Paydar, E Asadi-Gangraj
Journal of cleaner production 277, 123298, 2020
882020
A robust bi-level optimization modelling approach for municipal solid waste management; a real case study of Iran
S Pouriani, E Asadi-Gangraj, MM Paydar
Journal of Cleaner Production 240, 118125, 2019
672019
Designing a mathematical model for dental tourism supply chain
F Ahmadimanesh, MM Paydar, E Asadi-Gangraj
Tourism management 75, 404-417, 2019
662019
A hybrid genetic algorithm for integrating virtual cellular manufacturing with supply chain management considering new product development
A Rostami, MM Paydar, E Asadi-Gangraj
Computers & Industrial Engineering 145, 106565, 2020
432020
Metaheuristic algorithms to allocate and schedule of the rescue units in the natural disaster with fatigue effect
S Nayeri, E Asadi-Gangraj, S Emami
Neural Computing and Applications 31 (11), 7517–7537, 2019
362019
Reaching sustainability through collection center selection considering risk: using the integration of Fuzzy ANP-TOPSIS and FMEA
M Pourmehdi, MM Paydar, E Asadi-Gangraj
Soft Computing 25, 10885-10899, 2021
342021
A multi-objective location-routing model for dental waste considering environmental factors
G Kordi, P Hasanzadeh-Moghimi, MM Paydar, E Asadi-Gangraj
Annals of Operations Research, 1-38, 2023
212023
Goal programming-based post-disaster decision making for allocation and scheduling the rescue units in natural disaster with time-window
S Nayeri, GE ASADI, S Emami
International Journal of Industrial Engineering & Production Research 29 (1 …, 2018
212018
Designing a reverse logistics network to manage construction and demolition wastes: A robust bi-level approach
A Jahangiri, E Asadi-Gangraj, A Nemati
Journal of Cleaner Production 380, 134809, 2022
162022
Flexible Flow Shop Scheduling Problem to Minimize Makespan with Renewable Resources
N Abbaszadeh, E Asadi-Gangraj, S Emami
Scientia Iranica 28 (3), 1853- 1870, 2021
162021
Lagrangian relaxation approach to minimize makespan for hybrid flow shop scheduling problem with unrelated parallel machines
E Asadi-Gangraj
Scientia Iranica 25 (6), 3765-3775, 2018
152018
A hybrid approach based on LP metric method and genetic algorithm for the vehicle-routing problem with time windows, driver-specific times, and vehicles-specific capacities
E Asadi-Gangraj, S Nayeri
International Journal of Operations Research and Information Systems (IJORIS …, 2018
142018
Designing a bi-objective decision support model for the disaster management
S Nayeri, E Asadi-Gangraj, S Emami, J Rezaeian
RAIRO-Operations Research 55 (6), 3399-3426, 2021
122021
Designing a robust sustainable reverse logistics to waste of electrical and electronic equipment: a case study
H Najm, E Asadi-Gangraj
International Journal of Environmental Science and Technology 21 (2), 1559–1574, 2024
72024
A bi-objective model for Cancer hospitals’ location and cancer patients’ allocation in Iran
M Haghshenas, A Nemati, E Asadi-Gangraj
Int J Hosp Res 10 (4), 1-18, 2021
62021
Scheduling on flexible flow shop with cost-related objective function considering outsourcing options
M Enayati, E Asadi-Gangraj, MM Paydar
Journal of Optimization in Industrial Engineering 14 (2), 69-88, 2021
62021
A Simultaneous Worker Assignment and Scheduling Problem to Minimize Makespan in Flexible Flow Shop via Metaheuristic Approaches
E Asadi-Gangraj, F Bozorgnezhad, MM Paydar
نشریه بین المللی مهندسی صنایع و تحقیقات تولید 30 (2), 207-223, 2019
6*2019
Network configuration distributed production scheduling problem: A constraint programming approach
G Ziadlou, S Emami, E Asadi-Gangraj
Computers & Industrial Engineering 188, 109916, 2024
52024
В данный момент система не может выполнить эту операцию. Повторите попытку позднее.
Статьи 1–20