The use of andon in high rise building SL Kemmer, MA Saraiva, LFM Heineck, AVL Pacheco, MDV Novaes, ... proceedings of the 14th annual conference of the international group for …, 2006 | 60 | 2006 |
BIM-FM implementation: an exploratory invesigation R Codinhoto, A Kiviniemi, S Kemmer, CG da Rocha International Journal of 3-D information modeling (IJ3DIM) 2 (2), 1-15, 2013 | 55 | 2013 |
Suggestions to improve lean construction planning B Dave, JP Hämäläinen, S Kemmer, L Koskela, A Koskenvesa IGLC. net, 2015 | 44 | 2015 |
Incentives and innovation to sustain lean construction implementation TCL Alves, JP Barros Neto, LFM Heineck, SL Kemmer, PE Pereira Annual Conference of the International Group for Lean Construction, 2009 | 43 | 2009 |
Using the line of balance for production system design SL Kemmer, LFM Heineck, TCL Alves Encontro Nacional de Engenharia de Produção, 2008 | 40 | 2008 |
Medium-term planning: contributions based on field application SL Kemmer, LFM Heineck, MV Novaes, CAMA Mourão, TCL Alves International Group for Lean Construction, 2007 | 36 | 2007 |
Guidelines for the management of complex socio-technical systems: an exploratory study of a refurbishment project TA Saurin, J Rooke, L Koskela, S Kemmer 21st Annual summit of the international group for lean construction 1, 13-22, 2013 | 33 | 2013 |
Integrating product and process design in construction CG da Rocha, S Kemmer Construction management and economics 36 (9), 535-543, 2018 | 32 | 2018 |
Developing a lean model for production management of refurbishment projects S Kemmer, L Koskela Proceedings of the 20th annual conference of the international group for …, 2012 | 30 | 2012 |
Method to implement delayed product differentiation in construction of high-rise apartment building projects CG da Rocha, SL Kemmer Journal of construction engineering and management 139 (10), 05013001, 2013 | 29 | 2013 |
Development of a method for construction management in refurbishment projects S Kemmer University of Huddersfield, 2018 | 20 | 2018 |
Managing customization strategies to reduce workflow variations in house building projects CG da Rocha, SL Kemmer, L Meneses Journal of construction engineering and management 142 (8), 05016005, 2016 | 18 | 2016 |
Implementing Last Planner in the context of social housing retrofit S Kemmer, C Biotto, F Chaves, L Koskela, P Tzortzopoulos Proc. 24th Ann. Conf. of the Int’l. Group for Lean Construction, Boston, MA …, 2016 | 16 | 2016 |
Lean office at a construction company SL Kemmer, TCL Alves, M Macedo, MV Novaes, JP Barros Neto Annual Conference of the International Group for Lean Construction, 2009 | 16 | 2009 |
Application of lean principles to manage a customisation process SL Kemmer, CG Rocha, LO Meneses, AVL Pacheco, CT Formoso ANNUAL CONFERENCE OF THE INTERNATIONAL GROUP FOR LEAN CONSTRUCTION 18, 306-315, 2010 | 15 | 2010 |
Towards a lean model for production management of refurbishment projects S Kemmer, L Koskela, V Nykänen VTT, 2013 | 13 | 2013 |
Managing the information flow in customised apartment building projects CG da Rocha, SL Kemmer, L Meneses, CT Formoso Proc., 21th Annual Conf. of the Int. Group for Lean Construction, edited by …, 2013 | 12 | 2013 |
A lean way of design and production for healthcare construction projects S Kemmer, L Koskela, S Sapountzis, R Codinhoto | 12 | 2011 |
Melhorias de processos com a aplicação da filosofia lean TR Francelino, JP Barros Neto, LFM Heineck, MC Teixeira, SL Kemmer ENEGEP, 2006 | 11 | 2006 |
Análise de diferentes tempos de ciclo na formulação de planos de ataque de edifícios de múltiplos pavimentos SL Kemmer Florianópolis, SC, 2006 | 9 | 2006 |