Waste in Turkish construction: need for lean construction techniques G Polat, G Ballard Proceedings of the 12th Annual Conference of the International Group for …, 2004 | 212 | 2004 |
Factors affecting the use of precast concrete systems in the United States G Polat Journal of Construction Engineering and Management 134 (3), 169-178, 2008 | 196 | 2008 |
Fatal accidents in nighttime vs. daytime highway construction work zones D Arditi, DE Lee, G Polat Journal of Safety Research 38 (4), 399-405, 2007 | 142 | 2007 |
Build-operate-transfer in infrastructure projects in the United States AM Algarni, D Arditi, G Polat Journal of Construction Engineering and Management 133 (10), 728-735, 2007 | 138 | 2007 |
Subcontractor selection using the integration of the AHP and PROMETHEE methods G Polat Journal of Civil Engineering and Management 22 (8), 1042-1054, 2016 | 135 | 2016 |
The JIT materials management system in developing countries G Polat, D Arditi Construction Management and Economics 23 (7), 697-712, 2005 | 124 | 2005 |
Precast concrete systems in developing vs. industrialized countries G Polat Journal of civil engineering and management 16 (1), 85-94, 2010 | 111 | 2010 |
Identification of root causes of construction and demolition (C&D) waste: The case of Turkey G Polat, A Damci, H Turkoglu, AP Gurgun Procedia engineering 196, 948-955, 2017 | 106 | 2017 |
9–12 yaş grubu çocuklarda 12 haftalık temel badminton eğitimi antrenmanlarının motorik fonksiyonları ve reaksiyon zamanları üzerine etkileri G Polat Çukurova Üniversitesi, Sağlık Bilimleri Enstitüsü, Beden Eğitimi ve Spor …, 2009 | 88 | 2009 |
Marketing practices of US contractors D Arditi, G Polat, SA Makinde Journal of Management in Engineering 24 (4), 255-264, 2008 | 85 | 2008 |
Marketing management functions of construction companies: Evidence from Turkish contractors G Polat, U Donmez Journal of Civil Engineering and Management 16 (2), 267-277, 2010 | 78 | 2010 |
Predicting the risk of contractor default in Saudi Arabia utilizing artificial neural network (ANN) and genetic algorithm (GA) techniques OS Al‐Sobiei, D Arditi, G Polat Construction Management and Economics 23 (4), 423-430, 2005 | 78 | 2005 |
Resource leveling in line‐of‐balance scheduling A Damci, D Arditi, G Polat Computer‐Aided Civil and Infrastructure Engineering 28 (9), 679-692, 2013 | 76 | 2013 |
An integrated fuzzy MCGDM approach for supplier selection problem G Polat, E Eray, BN Bingol Journal of Civil Engineering and Management 23 (7), 926-942, 2017 | 73 | 2017 |
Factors affecting cost overruns in micro-scaled construction companies G Polat, F Okay, E Eray Procedia engineering 85, 428-435, 2014 | 68 | 2014 |
An integrated approach using AHP-ER to supplier selection in railway projects G Polat, E Eray Procedia Engineering 123, 415-422, 2015 | 66 | 2015 |
Simulation-based decision support system for economical supply chain management of rebar G Polat, D Arditi, U Mungen Journal of Construction Engineering and Management 133 (1), 29-39, 2007 | 58 | 2007 |
Multiresource leveling in line-of-balance scheduling A Damci, D Arditi, G Polat Journal of Construction Engineering and Management 139 (9), 1108-1116, 2013 | 54 | 2013 |
Impacts of different objective functions on resource leveling in construction projects: A case study A Damci, G Polat Journal of civil engineering and management 20 (4), 537-547, 2014 | 52 | 2014 |
Construction supply chains: Turkish supply chain configurations for cut and bent rebar G Polat, G Ballard Proc., 11th Annual Conf. on Lean Construction, 319-331, 2003 | 50 | 2003 |