Sledovať
Chao Wang
Chao Wang
Associate Professor and Graduate Program Advisor, Bert S. Turner Department of Construction
Overená e-mailová adresa na: lsu.edu - Domovská stránka
Názov
Citované v
Citované v
Rok
Automatic BIM component extraction from point clouds of existing buildings for sustainability applications
C Wang, YK Cho, C Kim
Automation in Construction 56, 1-13, 2015
3752015
Smart Scanning and Near Real-Time 3D Surface Modeling of Dynamic Construction Equipment from A Point Cloud
C Wang, Y Cho
Automation in Construction, 2014
1152014
ANN-based automated scaffold builder activity recognition through wearable EMG and IMU sensors
SS Bangaru, C Wang, SA Busam, F Aghazadeh
Automation in Construction 126, 103653, 2021
1142021
As-is 3D thermal modeling for existing building envelopes using a hybrid LIDAR system
C Wang, YK Cho, M Gai
Journal of Computing in Civil Engineering 27 (6), 645-656, 2013
1112013
Scanning electron microscopy (SEM) image segmentation for microstructure analysis of concrete using U-net convolutional neural network
SS Bangaru, C Wang, X Zhou, M Hassan
Automation in Construction 144, 104602, 2022
762022
Effects of a passive upper extremity exoskeleton for overhead tasks
P Yin, L Yang, S Qu, C Wang
Journal of Electromyography and Kinesiology 55, 102478, 2020
632020
Minimizing total energy cost and tardiness penalty for a scheduling-layout problem in a flexible job shop system: A comparison of four metaheuristic algorithms
A Ebrahimi, HW Jeon, S Lee, C Wang
Computers & Industrial Engineering 141, 106295, 2020
632020
Estimation of the degree of hydration of concrete through automated machine learning based microstructure analysis–A study on effect of image magnification
SS Bangaru, C Wang, M Hassan, HW Jeon, T Ayiluri
Advanced Engineering Informatics 42, 100975, 2019
572019
Performance evaluation of automatically generated BIM from laser scanner data for sustainability analyses
C Wang, YK Cho
Procedia engineering 118, 918-925, 2015
532015
Data quality and reliability assessment of wearable EMG and IMU sensor for construction activity recognition
SS Bangaru, C Wang, F Aghazadeh
Sensors 20 (18), 5264, 2020
502020
3D printing in construction: current status, implementation hindrances, and development agenda
X Ning, T Liu, C Wu, C Wang
Advances in Civil Engineering 2021 (1), 6665333, 2021
442021
Effects of wearable power assist device on low back fatigue during repetitive lifting tasks
P Yin, L Yang, C Wang, S Qu
Clinical Biomechanics 70, 59-65, 2019
422019
An agent-based simulation of occupancy schedule in office buildings
S Norouziasl, A Jafari, C Wang
Building and Environment 186, 107352, 2020
412020
Target-focused local workspace modeling for construction automation applications
YK Cho, C Wang, P Tang, CT Haas
Journal of Computing in Civil Engineering 26 (5), 661-670, 2012
412012
3D thermal modeling for existing buildings using hybrid LIDAR system
Y Cho, C Wang
Computing in Civil Engineering (2011), 552-559, 2011
312011
Automated and continuous fatigue monitoring in construction workers using forearm EMG and IMU wearable sensors and recurrent neural network
SS Bangaru, C Wang, F Aghazadeh
Sensors 22 (24), 9729, 2022
292022
Application of assistive wearable robotics to alleviate construction workforce shortage: Challenges and opportunities
C Wang, L Ikuma, J Hondzinski, M De Queiroz
Computing in Civil Engineering 2017, 358-365, 2017
292017
BIM-based construction noise hazard prediction and visualization for occupational safety and health awareness improvement
W Wei, C Wang, Y Lee
Computing in Civil Engineering 2017, 262-269, 2017
272017
A range free localization algorithm based on restricted-area for wireless sensor networks
C Wang, K Liu, N Xiao
2008 The Third International Multi-Conference on Computing in the Global …, 2008
262008
Application of as-built data in building retrofit decision making process
C Wang, YK Cho
Procedia engineering 118, 902-908, 2015
252015
Systém momentálne nemôže vykonať operáciu. Skúste to neskôr.
Články 1–20