Factors affecting construction cost in Mara large construction project: perspective of project management consultant AH Memon, IA Rahman, MR Abdullah, A Asmi International Journal of Sustainable Construction Engineering and Technology …, 2011 | 259 | 2011 |
Time and cost performance in construction projects in southern and central regions of Peninsular Malaysia AH Memon, IA Rahman, A Asmi International Journal of Advances in Applied Sciences 1 (1), 45-52, 2012 | 249 | 2012 |
Preliminary study on causative factors leading to construction cost overrun AH Memon, IA Rahman, A Asmi International Journal of Sustainable Construction Engineering and Technology …, 2011 | 248 | 2011 |
Factors contributing to physical and non-physical waste generation in construction industry S Nagapan, IA Rahman, A Asmi International Journal of Advances in Applied Sciences 1 (1), 1-10, 2012 | 204 | 2012 |
Issues on construction waste: The need for sustainable waste management S Nagapan, IA Rahman, A Asmi, AH Memon, I Latif 2012 IEEE colloquium on Humanities, Science and Engineering (CHUSER), 325-330, 2012 | 154 | 2012 |
Identifying Causes of Construction Waste –Case of Central Region of Peninsula Malaysia S Nagapan, IA Rahman, A Asmi, AH Memon, RM Zin International Journal of Integrated Engineering 4 (2), 2012 | 154 | 2012 |
Factors affecting construction cost performance in project management projects: Case of MARA large projects AH Memon, IA Rahman, MR Abdullah, A Asmi International Journal of Civil Engineering and Built Environment 1 (1), 30-35, 2014 | 132 | 2014 |
Controlling cost overrun factors in construction projects in Malaysia A Asmi, AH Memon, IA Rahman, ATA Karim Research Journal of Applied Sciences, Engineering and Technology 5 (8), 2621 …, 2012 | 126 | 2012 |
A review of construction waste cause factors S Nagapan, IA Rahman, A Asmi Asian conference on real estate: sustainable growth managing challenges …, 2011 | 109 | 2011 |
Construction waste management: Malaysian perspective S Nagapan, IA Rahman, A Asmi International Conference on Civil and Environmental Engineering …, 2012 | 104 | 2012 |
Significant risk factors in construction projects: Contractor's perception NAA Karim, IA Rahman, AH Memmon, N Jamil, A Asmi Humanities, Science and Engineering (CHUSER), 2012 IEEE Colloquium on, 347-350, 2012 | 103 | 2012 |
Significant Risk Factors in Construction Projects: Contractor’s Perception IA Nur Alkaf Abd Karim, RAH Memmon, N Jamil, A Asmi 2012 IEEE Colloquium on Humanities, Science and Engineering Research (CHUSER …, 2012 | 103* | 2012 |
Time overrun in construction projects from the perspective of project management consultant (PMC) AH Memon, I Abdul Rahman, MR Abdullah, A Asmi Journal of Surveying, Construction and Property (JSCP) 2 (1), 2011 | 97 | 2011 |
The cause factors of large project's cost overrun: a survey in the southern part of Peninsular Malaysia AH Memon, I Abdul Rahman, A Asmi International Journal of Real Estate Studies (INTREST) 7 (2), 2014 | 96 | 2014 |
Modeling causes of cost overrun in large construction projects with partial least square-SEM approach: contractor's perspective I Abdul Rahman, AH Memon, A Asmi, NH Abdullah Research Journal of Applied Sciences, Engineering and Technology 5 (6), 1963 …, 2013 | 94 | 2013 |
Causes of delay in MARA management procurement construction projects MR Abdullah, IA Rahman, A Asmi Journal of Surveying, Construction and Property 1 (1), 123-138, 2010 | 93 | 2010 |
Study of site's construction waste in Batu Pahat, Johor S Nagapan, IA Rahman, A Asmi, NF Adnan Procedia Engineering 53, 99-103, 2013 | 92 | 2013 |
Time and cost performance of costruction projects in southern and cenrtal regions of Penisular Malaysia IA Rahman, AH Memon, S Nagapan, QBAI Latif, A Asmi Humanities, Science and Engineering (CHUSER), 2012 IEEE Colloquium on, 52-57, 2012 | 83 | 2012 |
Using structural equation modelling to assess effects of construction resource related factors on cost overrun AH Memon, IA Rahman, A Asmi, NH Abdullah World Applied Sciences Journal 21 (5), 6-15, 2013 | 80 | 2013 |
Challenges faced by construction industry in accomplishing sustainablity goals A Asmi, AH Memon, IA Rahman, S Nagapan, QBAI Latif Business, Engineering and Industrial Applications (ISBEIA), 2012 IEEE …, 2012 | 80 | 2012 |