Monte Carlo technique with correlated random variables A Touran, EP Wiser Journal of Construction Engineering and Management 118 (2), 258-272, 1992 | 215 | 1992 |
A systems analysis tool for construction and demolition wastes management JY Wang, A Touran, C Christoforou, H Fadlalla Waste management 24 (10), 989-997, 2004 | 169 | 2004 |
Selection of project delivery method in transit: Drivers and objectives A Touran, DD Gransberg, KR Molenaar, K Ghavamifar Journal of management in engineering 27 (1), 21-27, 2011 | 165 | 2011 |
Modeling cost escalation in large infrastructure projects A Touran, R Lopez Journal of construction engineering and management 132 (8), 853-860, 2006 | 162 | 2006 |
An analysis of cost and duration for deconstruction and demolition of residential buildings in Massachusetts N Dantata, A Touran, J Wang Resources, conservation and recycling 44 (1), 1-15, 2005 | 150 | 2005 |
Probabilistic cost estimating with subjective correlations A Touran Journal of Construction Engineering and Management 119 (1), 58-71, 1993 | 145 | 1993 |
Probabilistic model for cost contingency A Touran Journal of construction engineering and management 129 (3), 280-284, 2003 | 124 | 2003 |
Calculation of contingency in construction projects A Touran IEEE transactions on engineering management 50 (2), 135-140, 2003 | 115 | 2003 |
A collision model for safety evaluation of autonomous intelligent cruise control A Touran, MA Brackstone, M McDonald Accident Analysis & Prevention 31 (5), 567-578, 1999 | 98 | 1999 |
A guidebook for selecting airport capital project delivery methods A Touran Transportation Research Board, 2009 | 88 | 2009 |
An overview of budget contingency calculation methods in construction industry P Bakhshi, A Touran Procedia Engineering 85, 52-60, 2014 | 85 | 2014 |
Simulation of tunneling operations A Touran, T Asai Journal of Construction Engineering and Management 113 (4), 554-568, 1987 | 83 | 1987 |
Public-private partnership experience in the international arena: Case of Turkey AP Gurgun, A Touran Journal of Management in Engineering 30 (6), 04014029, 2014 | 71 | 2014 |
Integration of simulation with expert systems A Touran Journal of Construction Engineering and Management 116 (3), 480-493, 1990 | 61 | 1990 |
Rank correlations in simulating construction costs A Touran, L Suphot Journal of construction engineering and management 123 (3), 297-301, 1997 | 48 | 1997 |
Alternative project delivery systems: Applications and legal limits in transportation projects K Ghavamifar, A Touran Journal of Professional Issues in Engineering Education and Practice 134 (1 …, 2008 | 46 | 2008 |
Analysis of the United States Department of Transportation prompt pay provisions A Touran, M Atgun, I Bhurisith Journal of Construction Engineering and Management 130 (5), 719-725, 2004 | 46 | 2004 |
Trends in US rail transit project cost overrun NA Dantata, A Touran, DC Schneck Transportation Research Board, 2006 | 44 | 2006 |
Simulation and analysis of construction operations BC Paulson Jr, SA Douglas, A Kalk, A Touran, GA Victor Journal of Technical Topics in Civil Engineering 109 (2), 89-104, 1983 | 43 | 1983 |
Cost overruns and formal risk assessment program in US rail transit projects N Gao, A Touran Journal of construction engineering and management 146 (5), 05020004, 2020 | 37 | 2020 |