Прати
Ahmad Ali Salah
Ahmad Ali Salah
Assistant Professor, Imam Abdulrahman bin Faisal University
Верификована је имејл адреса на iau.edu.sa
Наслов
Навело
Навело
Година
Near optimum selection of module configuration for efficient modular construction
T Salama, A Salah, O Moselhi, M Al-Hussein
Automation in construction 83, 316-329, 2017
1322017
Contingency modelling for construction projects using fuzzy-set theory
A Salah, O Moselhi
Engineering, Construction and Architectural Management 22 (2), 214-241, 2015
962015
Risk identification and assessment for engineering procurement construction management projects using fuzzy set theory
A Salah, O Moselhi
Canadian Journal of Civil Engineering 43 (5), 429-442, 2016
672016
Integrating critical chain project management with last planner system for linear scheduling of modular construction
T Salama, A Salah, O Moselhi
Construction innovation 21 (4), 525-554, 2021
422021
Integration of linear scheduling method and the critical chain project management
T Salama, A Salah, O Moselhi
Canadian Journal of Civil Engineering 45 (1), 30-40, 2018
282018
Integration of offsite and onsite schedules in modular construction
T Salama, A Salah, O Moselhi
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2017
262017
Overview of fuzzy hybrid techniques in construction engineering and management
NG Seresht, R Lourenzutti, A Salah, AR Fayek
Fuzzy hybrid computing in construction engineering and management: Theory …, 2018
202018
Study of factors influencing productivity of hauling equipment in earthmoving projects using fuzzy set theory
A Salem, A Salah, M Ibrahim, O Moselhi
International Journal of Innovation, Management and Technology 8 (2), 151, 2017
192017
Configuration of hybrid modular construction for residential buildings
T Salama, A Salah, O Moselhi
International Journal of Innovation, Management and Technology 8 (2), 106-112, 2017
182017
Alternative scheduling and planning processes for hybrid offsite construction
T Salama, A Salah, O Moselhi
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2016
152016
Fuzzy set-based risk management for construction projects
A Salah
Concordia University, 2015
142015
Fuzzy set-based contingency estimating and management
O Moselhi, A Salah
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2012
132012
Fuzzy Set-Based Contingency Estimating and Management
A Salah
Concordia University, 2012
112012
Fuzzy-based configuration of automated data acquisition systems for earthmoving operations.
A Salem, A Salah, O Moselhi
J. Inf. Technol. Constr. 23, 122-137, 2018
82018
Automated fuzzy set-based system for monitoring the effects of productivity variation on earthmoving projects
A Salah, A Salem, O Moselhi
International Journal of Innovation, Management and Technology 8 (2), 85, 2017
52017
Estimating post-and pre-mitigation contingency in construction
A Salah, O Moselhi
Risk Analysis 9, 243, 2014
52014
Quantitative and qualitative risk in EPCM projects using fuzzy set theory
A Salah, O Moselhi
2013 Joint IFSA World Congress and NAFIPS Annual Meeting (IFSA/NAFIPS), 1177 …, 2013
42013
INTEGRATED SCHEDULING OF MODULAR CONSTRUCTION USING “MOD-SCHEDULER”
T Salama, A Salah, O Moselhi
Proceedings of the 7th International Canadian Society for Civil Engineering …, 2019
12019
Analysis of Factors Affecting the Performance of Dynamic Compaction Technique: A Study of Coastal Area of Eastern Province in Saudi Arabia
A Salah, M Sodangi, ES Derdas, JN Al Nasser, AA Alshehri
Qatar University Press, 2023
2023
Систем тренутно не може да изврши ову радњу. Пробајте поново касније.
Чланци 1–19