Adaptive particle swarm optimization for integrated quay crane and yard truck scheduling problem DC Hop, N Van Hop, TTM Anh Computers & Industrial Engineering 153, 107075, 2021 | 57 | 2021 |
An improved hybrid metaheuristics and rule-based approach for flexible job-shop scheduling subject to machine breakdowns LM Thi, TT Mai Anh, N Van Hop Engineering Optimization 55 (9), 1535-1555, 2023 | 19 | 2023 |
Matheuristics for mixed-model assembly line balancing problem with fuzzy stochastic processing time TTM Anh, N Van Hop Applied Soft Computing 160, 111694, 2024 | 6 | 2024 |
Hybrid genetic-bees algorithm in multi-layer perceptron optimization TTM Anh, TD Vi Proceedings of International Conference on Data Science and Applications …, 2023 | 4 | 2023 |
Hybrid Genetic Bees Algorithm (GBA) for Continuous and Combinatorial Optimisation Problems TD Vi, VHA Thu, TTM Anh, NDM Vy Intelligent Engineering Optimisation with the Bees Algorithm, 175-196, 2024 | | 2024 |
Hybrid Genetic Bees Algorithm (GBA) TD Vi, VHA Thu, TTM Anh, NDM Vy Intelligent Engineering Optimisation with the Bees Algorithm, 175, 2024 | | 2024 |
Survivable Ring Star Problem under the failure of two hubs ATM Truong, S Toubaline, A Rossi Société française de Recherche Opérationnelle et Aide à la Décision (ROADEF), 2024 | | 2024 |