The quantitative risk assessment of MINI, MIDI and MAXI horizontal directional drilling projects applying fuzzy fault tree analysis
M Gierczak
Tunnelling and Underground Space Technology 43, 67-77, 2014
462014
Effective risk management in innovative projects: A case study of the construction of energy-efficient, sustainable building of the laboratory of intelligent building in Cracow
M Krechowicz
IOP Conference Series: Materials Science and Engineering 245 (6), 062006, 2017
452017
Machine learning approaches to predict electricity production from renewable energy sources
A Krechowicz, M Krechowicz, K Poczeta
Energies 15 (23), 9146, 2022
402022
Buckling failure numerical analysis of HDPE pipes used for the trenchless rehabilitation of a reinforced concrete sewer
E Kuliczkowska, M Gierczak
Engineering Failure Analysis 32, 106-112, 2013
292013
The qualitative risk assessment of MINI, MIDI and MAXI horizontal directional drilling projects
M Gierczak
Tunnelling and Underground Space Technology 44, 148-156, 2014
282014
Comprehensive risk management in horizontal directional drilling projects
M Krechowicz
Journal of construction engineering and management 146 (5), 04020034, 2020
262020
Risk management in complex construction projects that apply renewable energy sources: A case study of the realization phase of the Energis educational and research intelligent …
M Krechowicz
IOP Conference Series: Materials Science and Engineering 245 (6), 062007, 2017
232017
Reduction of the risk of inaccurate prediction of electricity generation from PV farms using machine learning
M Krechowicz, A Krechowicz, L Lichołai, A Pawelec, JZ Piotrowski, ...
Energies 15 (11), 4006, 2022
182022
Risk assessment in energy infrastructure installations by horizontal directional drilling using machine learning
M Krechowicz, A Krechowicz
Energies 14 (2), 289, 2021
182021
Qualitative risk assessment of passive house design and construction processes
M Krechowicz
IOP Conference Series: Materials Science and Engineering 960 (4), 042068, 2020
132020
The hybrid Fuzzy Fault and Event Tree analysis in the geotechnical risk management in HDD projects
M Krechowicz
Georisk: Assessment and Management of Risk for Engineered Systems and …, 2021
122021
Human and equipment risk factors evaluation in Horizontal Directional Drilling technology using Failure Mode and Effect Analysis
M Krechowicz, W Gierulski, S Loneragan, H Kruse
Management and Production Engineering Review 12, 2021
112021
Towards sustainable project management: evaluation of relationship-specific risks and risk determinants threatening to achieve the intended benefit of interorganizational …
M Krechowicz
Sustainability 14 (5), 2961, 2022
102022
Risk and opportunity assessment model for CSR initiatives in the face of Coronavirus
M Krechowicz, K Kiliańska
Sustainability 13 (11), 6177, 2021
102021
Comprehensive risk management in passive buildings projects
M Krechowicz, JZ Piotrowski
Energies 14 (20), 6830, 2021
102021
External risk factors evaluation in horizontal directional drilling technology using failure mode and effect analysis
M Krechowicz, W Gierulski, S Loneragan, H Kruse
Management and Production Engineering Review 13 (1), 76-88, 2022
92022
A multi-label text message classification method designed for applications in call/contact centre systems
K Poczeta, M Płaza, T Michno, M Krechowicz, M Zawadzki
Applied Soft Computing 145, 110562, 2023
82023
Sustainable Construction—Technological Aspects of Ecological Wooden Buildings
A Stepien, JZ Piotrowski, S Munik, M Balonis, M Kwiatkowska, ...
Energies 15 (23), 8823, 2022
82022
Analiza ryzyka w technologii horyzontalnych przewiertów sterowanych
M Gierczak
Praca doktorska, Politechnika Świętokrzyska, Kielce, 2013
52013
Wybrane czynniki ryzyka w wykopowej i bezwykopowej budowie podziemnych rurociągów i kanałów
A Kuliczkowski, M Gierczak
Instal, 44-48, 2011
52011