The way forward in sustainable construction: issues and challenges
JM Hussin, IA Rahman, AH Memon
International Journal of Advances in Applied Sciences 2 (1), 15-24, 2013
4422013
Significant factors causing cost overruns in large construction projects in Malaysia
IA Rahman, AH Memon, ATA Karim, A Tarmizi
Journal of Applied sciences 13 (2), 286-293, 2013
3422013
SEM‐PLS analysis of inhibiting factors of cost performance for large construction projects in Malaysia: Perspective of clients and consultants
AH Memon, IA Rahman
The Scientific World Journal 2014 (1), 165158, 2014
2702014
Factors affecting construction cost in Mara large construction project: perspective of project management consultant
AH Memon, IA Rahman, MR Abdullah, AAA Azis
International Journal of Sustainable Construction Engineering and Technology …, 2010
2702010
Preliminary study on causative factors leading to construction cost overrun
AH Memon, IA Rahman, AAA Azis
International Journal of Sustainable Construction Engineering and Technology …, 2011
2582011
Time and cost performance in construction projects in southern and central regions of Peninsular Malaysia
AH Memon, IA Rahman, AAA Azis
International Journal of advances in applied sciences 1 (1), 45-52, 2012
2502012
BIM in Malaysian construction industry: status, advantages, barriers and strategies to enhance the implementation level
AH Memon, IA Rahman, I Memon, NIA Azman
Research Journal of Applied Sciences, Engineering and Technology 8 (5), 606-614, 2014
2092014
Identifying Causes of Construction Waste –Case of Central Region of Peninsula Malaysia
S Nagapan, IA Rahman, A Asmi, AH Memon, RM Zin
International Journal of Integrated Engineering 4 (2), 2012
1612012
Issues on construction waste: The need for sustainable waste management
S Nagapan, IA Rahman, A Asmi, AH Memon, I Latif
2012 IEEE colloquium on Humanities, Science and Engineering (CHUSER), 325-330, 2012
1542012
Significant causes and effects of variation orders in construction projects
AH Memon, IA Rahman, MFA Hasan
Research Journal of Applied Sciences, Engineering and Technology 7 (21 …, 2014
1482014
Factors affecting construction cost performance in project management projects: Case of MARA large projects
AH Memon, IA Rahman, MR Abdullah, AAA Azis
International Journal of Civil Engineering and Built Environment 1 (1), 30-35, 2014
1392014
Controlling Cost Overrun Factors in Construction Projects in Malaysia
AA Abdul Azis, AH Memon, IA Rahman, AT Abd. Karim
Research Journal of Applied Sciences, Engineering and Technology 5 (8), 2621 …, 2013
1322013
Analysis of cost overrun factors for small scale construction projects in Malaysia using PLS-SEM method
AH Memon, IA Rahman
Modern applied science 7 (8), 78, 2013
1182013
Relationship between factors of construction resources affecting project cost
IA Rahman, AH Memon, ATA Karim
Modern Applied Science 7 (1), 67-75, 2013
1172013
Significant risk factors in construction projects: Contractor's perception
NA Abd Karim, IA Rahman, AH Memmon, N Jamil, AAA Azis
2012 IEEE Colloquium on Humanities, Science and Engineering (CHUSER), 347-350, 2012
1002012
The cause factors of large project’s cost overrun: a survey in the southern part of Peninsular Malaysia
AH Memon, IA Rahman, AAA Aziz
International Journal of Real Estate Studies 7 (2), 1-15, 2012
992012
Time overrun in construction projects from the perspective of project management consultant (PMC)
AH Memon, I Abdul Rahman, AAA Aziz
Journal of Surveying, Construction and Property 2 (1), 2011
992011
Modeling causes of cost overrun in large construction projects with partial least square-SEM approach: contractor's perspective
IA Rahman, AH Memon, AAA Aziz, NH Abdullah
Research Journal of Applied Sciences, Engineering and Technology 5 (06 …, 2013
962013
Time and cost performance of costruction projects in southern and cenrtal regions of Penisular Malaysia
IA Rahman, AH Memon, S Nagapan, QBAI Latif, AAA Azis
2012 IEEE Colloquium on Humanities, Science and Engineering (CHUSER), 52-57, 2012
872012
Examining factors affecting budget overrun of construction projects undertaken through management procurement method using PLS-SEM approach
IA Rahman, AH Memon, AT Abd Karim
Procedia-Social and Behavioral Sciences 107, 120-128, 2013
832013