Följ
Zheng Zuo
Zheng Zuo
State Power Investment Corporation
Verifierad e-postadress på spic.com.cn
Titel
Citeras av
Citeras av
År
Abaqus implementation of monolithic and staggered schemes for quasi-static and dynamic fracture phase-field model
G Liu, Q Li, MA Msekh, Z Zuo
Computational Materials Science 121, 35-47, 2016
2512016
Thermal analysis of mass concrete embedded with double-layer staggered heterogeneous cooling water pipes
J Yang, Y Hu, Z Zuo, F Jin, Q Li
Applied Thermal Engineering 35, 145-156, 2012
1052012
Numerical analysis on temperature rise of a concrete arch dam after sealing based on measured data
Q Li, G Liang, Y Hu, Z Zuo
Mathematical Problems in Engineering 2014 (1), 602818, 2014
262014
Data Mining of the Thermal Performance of Cool‐Pipes in Massive Concrete via In Situ Monitoring
Z Zuo, Y Hu, Q Li, L Zhang
Mathematical Problems in Engineering 2014 (1), 985659, 2014
242014
XFEM for thermal crack of massive concrete
G Liu, Y Hu, Q Li, Z Zuo
Mathematical Problems in Engineering 2013 (1), 343842, 2013
222013
An extended finite element method for pipe-embedded plane thermal analysis
Z Zuo, Y Hu, Q Li, G Liu
Finite Elements in Analysis and Design 102, 52-64, 2015
212015
Boolean‐Based Surface Procedure for the External Heat Transfer Analysis of Dams during Construction
Y Hu, Z Zuo, Q Li, Y Duan
Mathematical Problems in Engineering 2013 (1), 175616, 2013
192013
Smart monitoring of a super high arch dam during the first reservoir-filling phase
Q Li, Z Zuo, Y Hu, G Liang
Journal of Aerospace Engineering 30 (2), B4016001, 2017
172017
Simulation of the temperature field in mass concrete with double layers of cooling pipes during construction
Z Zuo, Y Hu, Y Duan, J Yang
Journal of Tsinghua University Science and Technology 52 (2), 2012
142012
A monitoring-mining-modeling system and its application to the temperature status of the Xiluodu arch dam
Y Hu, G Liang, Q Li, Z Zuo
Advances in Structural Engineering 20 (2), 235-244, 2017
112017
高拱坝施工期横缝增开现象及其相关成因研究
胡昱, 左正, 李庆斌, 罗丹旎
水力发电学报 32 (5), 218-225, 2013
92013
考虑双层异质水管的大体积混凝土施工期温度场仿真
左正, 胡昱, 段云岭, 杨剑
清华大学学报: 自然科学版 52 (2), 186-189, 2012
82012
Crucial Geo-qualities and Predominant Defects Treatment on Foundation Zones of Sino Mainland Xiluodu Arch Dam
YJ Wang, Y Hu, Z Zuo, LP Zhi, HX Gao
Advanced Materials Research 446, 1997-2001, 2012
72012
Temperature monitoring during concrete setting through cooling pipe monitors
ZUO Zheng, HU Yu, LI Qingbin, LI Bingfeng
Journal of Tsinghua University (Science and Technology) 55 (1), 21-26, 2015
62015
基于第 5 代 HTML 标准的拱坝工程三维可视化网络平台
左正, 胡昱, 段云岭, 李庆斌, 冯金铭, 张丽媛
计算机辅助设计与图形学学报 26 (4), 590-596, 2014
62014
拱坝梯度控裂理论与方法
胡昱, 林鹏, 孙志禹, 汪志林, 左正, 李庆斌
水力发电学报 36 (11), 102-110, 2017
52017
相场断裂模型分步算法在 ABAQUS 中的实现
刘国威, 李庆斌, 左正
岩石力学与工程学报 35 (5), 1019-1030, 2016
52016
大体积混凝土温度应力耦合直观化仿真计算系统
左正, 胡昱, 李庆斌, 李祥, 梁国贺
计算力学学报 30 (z1), 1-6, 2013
52013
基于实际通水监测的大体积混凝土数字温度监测
左正, 胡昱, 李庆斌, 李炳锋, 黄涛
清华大学学报: 自然科学版, 21-26, 2015
32015
导电混凝土应用于建筑采暖工程的计算方法
左正, 杨晶, 胡昱, 王亚军
土木与环境工程学报 (中英文) 35 (4), 139-144, 2013
22013
Systemet kan inte utföra åtgärden just nu. Försök igen senare.
Artiklar 1–20