Följ
Ernie Kee
Ernie Kee
Research Associate, Nuclear Plasma & Rad. Engr., SoTeRiA-IAP
Verifierad e-postadress på illinois.edu - Startsida
Titel
Citeras av
Citeras av
År
Simulation-informed probabilistic methodology for common cause failure analysis
T Sakurahara, G Schumock, S Reihani, E Kee, Z Mohaghegh
Reliability Engineering & System Safety 185, 84-99, 2019
512019
Prioritizing project selection
A Koc, DP Morton, E Popova, SM Hess, E Kee, D Richards
The Engineering Economist 54 (4), 267-297, 2009
512009
An integrated methodology for spatio-temporal incorporation of underlying failure mechanisms into fire probabilistic risk assessment of nuclear power plants
T Sakurahara, Z Mohaghegh, S Reihani, E Kee, M Brandyberry, ...
Reliability Engineering & System Safety 169, 242-257, 2018
452018
Data-theoretic methodology and computational platform to quantify organizational factors in socio-technical risk analysis
J Pence, T Sakurahara, X Zhu, Z Mohaghegh, M Ertem, C Ostroff, E Kee
Reliability Engineering & System Safety 185, 240-260, 2019
392019
Risk-informed resolution of generic safety issue 191
Z Mohaghegh, E Kee, SA Reihani, R Kazemi, D Johnson, R Grantom, ...
International Topical Meeting on Probabilistic Safety Assessment and …, 2013
362013
Global importance measure methodology for integrated probabilistic risk assessment
T Sakurahara, S Reihani, E Kee, Z Mohaghegh
Proceedings of the Institution of Mechanical Engineers, Part O: Journal of …, 2020
312020
Basic factors to forecast maintenance cost and failure processes for nuclear power plants
E Popova, W Yu, E Kee, A Sun, D Richards, R Grantom
Nuclear Engineering and Design 236 (14-16), 1641-1647, 2006
302006
Corrosion and solubility in a TSP-buffered chemical environment following a loss of coolant accident: Part 1–Aluminum
KJ Howe, L Mitchell, SJ Kim, ED Blandford, EJ Kee
Nuclear Engineering and Design 292, 296-305, 2015
272015
Toward monitoring organizational safety indicators by integrating probabilistic risk assessment, socio-technical systems theory, and big data analytics
J Pence, Z Mohaghegh, E Kee, F Yilmaz, R Grantom, D Johnson
Proceedings of 12th international topical meeting on probabilistic safety …, 2014
272014
Quantifying organizational factors in human reliability analysis using the big data-theoretic algorithm
J Pence, Z Mohaghegh, V Dang, C Ostroff, E Kee, R Hubenak, MA Billings
International Topical Meeting on Probabilistic Safety Assessment and …, 2015
252015
An algorithm for enhancing spatiotemporal resolution of probabilistic risk assessment to address emergent safety concerns in nuclear power plants
H Bui, T Sakurahara, J Pence, S Reihani, E Kee, Z Mohaghegh
Reliability Engineering & System Safety 185, 405-428, 2019
242019
Integrating renewal process modeling with Probabilistic Physics-of-Failure: Application to Loss of Coolant Accident (LOCA) frequency estimations in nuclear power plants
T Sakurahara, N O'Shea, WC Cheng, S Zhang, S Reihani, E Kee, ...
Reliability Engineering & System Safety 190, 106479, 2019
232019
Application of Crow-AMSAA analysis to nuclear power plant equipment performance
A Sun, E Kee, W Yu, E Popova, R Grantom, D Richards
13th International Conference on Nuclear Engineering, 1-6, 2005
232005
GIS‐based integration of social vulnerability and level 3 probabilistic risk assessment to advance emergency preparedness, planning, and response for severe nuclear power plant …
J Pence, I Miller, T Sakurahara, J Whitacre, S Reihani, E Kee, ...
Risk analysis 39 (6), 1262-1280, 2019
212019
Methodology to evaluate the monetary benefit of Probabilistic Risk Assessment by modeling the net value of Risk-Informed Applications at nuclear power plants
J Pence, M Abolhelm, Z Mohaghegh, S Reihani, M Ertem, E Kee
Reliability Engineering & System Safety 175, 171-182, 2018
202018
Methodological and practical comparison of integrated probabilistic risk assessment (I-PRA) with the existing fire PRA of nuclear power plants
T Sakurahara, Z Mohaghegh, S Reihani, E Kee
Nuclear technology 204 (3), 354-377, 2018
192018
Review and categorization of existing studies on the estimation of probabilistic failure metrics for Reactor Coolant Pressure Boundary piping and steam generator tubes in …
WC Cheng, T Sakurahara, S Zhang, P Farshadmanesh, S Reihani, E Kee, ...
Progress in Nuclear Energy 118, 103105, 2020
162020
Experimental observations of boric acid precipitation scenarios
R Vaghetto, M Childs, P Jones, S Lee, E Kee, YA Hassan
Nuclear Engineering and Design 312, 422-428, 2017
162017
Integrated PRA methodology to advance fire risk modeling for nuclear power plants
T Sakurahara, SA Reihani, Z Mohaghegh, M Brandyberry, E Kee, ...
25th European Safety and Reliability Conference, ESREL 2015, 595-603, 2015
162015
RoverD: use of test data in GSI-191 risk assessment
E Kee, J Hasenbein, A Zolan, P Grissom, S Reihani, Z Mohaghegh, ...
Nuclear technology 196 (2), 270-291, 2016
152016
Systemet kan inte utföra åtgärden just nu. Försök igen senare.
Artiklar 1–20