Deadlock avoidance policy for Petri-net modeling of flexible manufacturing systems with shared resources KY Xing, BS Hu, HX Chen IEEE transactions on Automatic Control 41 (2), 289-295, 1996 | 346 | 1996 |
A genetic algorithm for flexible job-shop scheduling H Chen, J Ihlow, C Lehmann Proceedings 1999 IEEE International Conference on Robotics and Automation …, 1999 | 325 | 1999 |
Cyclic scheduling of a hoist with time window constraints H Chen, C Chu, JM Proth IEEE Transactions on Robotics and Automation 14 (1), 144-152, 1998 | 235 | 1998 |
A Stackelberg game and its improvement in a VMI system with a manufacturing vendor Y Yu, F Chu, H Chen European Journal of Operational Research 192 (3), 929-948, 2009 | 210 | 2009 |
The study of a dynamic dial-a-ride problem under time-dependent and stochastic environments Z Xiang, C Chu, H Chen European Journal of Operational Research 185 (2), 534-551, 2008 | 201 | 2008 |
A new model and hybrid approach for large scale inventory routing problems Y Yu, H Chen, F Chu European Journal of Operational Research 189 (3), 1022-1040, 2008 | 183 | 2008 |
Profit allocation mechanisms for carrier collaboration in pickup and delivery service B Dai, H Chen Computers & Industrial Engineering 62 (2), 633-643, 2012 | 180 | 2012 |
Adaptive large neighborhood search for the pickup and delivery problem with time windows, profits, and reserved requests Y Li, H Chen, C Prins European Journal of Operational Research 252 (1), 27-38, 2016 | 179 | 2016 |
Ant colony optimization for solving an industrial layout problem Y Hani, L Amodeo, F Yalaoui, H Chen European Journal of Operational Research 183 (2), 633-642, 2007 | 179 | 2007 |
A fast heuristic for solving a large-scale static dial-a-ride problem under complex constraints Z Xiang, C Chu, H Chen European journal of operational research 174 (2), 1117-1139, 2006 | 170 | 2006 |
An improvement of the Lagrangean relaxation approach for job shop scheduling: a dynamic programming method H Chen, C Chu, JM Proth IEEE transactions on robotics and automation 14 (5), 786-795, 1998 | 149 | 1998 |
An alternative framework to Lagrangian relaxation approach for job shop scheduling H Chen, PB Luh European Journal of Operational Research 149 (3), 499-512, 2003 | 131 | 2003 |
Modeling and performance evaluation of supply chains using batch deterministic and stochastic Petri nets H Chen, L Amodeo, F Chu, K Labadi IEEE Transactions on Automation Science and Engineering 2 (2), 132-144, 2005 | 117 | 2005 |
A multi-agent and auction-based framework and approach for carrier collaboration B Dai, H Chen Logistics Research 3, 101-120, 2011 | 116 | 2011 |
Fix-and-optimize and variable neighborhood search approaches for multi-level capacitated lot sizing problems H Chen Omega 56, 25-36, 2015 | 102 | 2015 |
Measuring slacks-based efficiency for commercial banks in China by using a two-stage DEA model with undesirable output Q An, H Chen, J Wu, L Liang Annals of Operations Research 235, 13-35, 2015 | 101 | 2015 |
Large scale stochastic inventory routing problems with split delivery and service level constraints Y Yu, C Chu, H Chen, F Chu Annals of Operations Research 197, 135-158, 2012 | 101 | 2012 |
A Lagrangian relaxation approach for a multi-mode inventory routing problem with transshipment in crude oil transportation Q Shen, F Chu, H Chen Computers & Chemical Engineering 35 (10), 2113-2123, 2011 | 90 | 2011 |
A cut-and-solve based algorithm for the single-source capacitated facility location problem Z Yang, F Chu, H Chen European Journal of Operational Research 221 (3), 521-532, 2012 | 86 | 2012 |
Competitive facility location and design with reactions of competitors already in the market N Saidani, F Chu, H Chen European journal of operational research 219 (1), 9-17, 2012 | 85 | 2012 |