Takip et
F. Frank Chen
F. Frank Chen
Mechanical Engineering/Center for Advanced Mfg & Lean Systems, University of Texas at San Antonio
utsa.edu üzerinde doğrulanmış e-posta adresine sahip
Başlık
Alıntı yapanlar
Alıntı yapanlar
Yıl
Unrelated parallel machine scheduling with setup times using simulated annealing
DW Kim, KH Kim, W Jang, FF Chen
Robotics and computer-integrated manufacturing 18 (3-4), 223-231, 2002
3742002
Development and applications of holonic manufacturing systems: a survey
RF Babiceanu, FF Chen
Journal of Intelligent Manufacturing 17, 111-131, 2006
3702006
A leanness measure of manufacturing systems for quantifying impacts of lean initiatives
H Wan, F Frank Chen
International journal of production research 46 (23), 6567-6584, 2008
3572008
Integration of Lean practices and Industry 4.0 technologies: smart manufacturing for next-generation enterprises
M Shahin, FF Chen, H Bouzary, K Krishnaiyer
The International Journal of Advanced Manufacturing Technology 107, 2927-2936, 2020
2652020
Measuring the impact of Lean tools on the cost–time investment of a product using cost–time profiles
L Rivera, FF Chen
Robotics and Computer-Integrated Manufacturing 23 (6), 684-689, 2007
2292007
Unrelated parallel machine scheduling with setup times and a total weighted tardiness objective
DW Kim, DG Na, FF Chen
Robotics and Computer-Integrated Manufacturing 19 (1-2), 173-181, 2003
1832003
The impact of flexible manufacturing systems on productivity and quality
FF Chen, EE Adam
IEEE transactions on engineering management 38 (1), 33-45, 1991
1671991
Virtual manufacturing: an overview
C Shukla, M Vazquez, FF Chen
Computers & Industrial Engineering 31 (1-2), 79-82, 1996
1571996
Process modeling and analysis of manufacturing supply chain networks using object-oriented Petri nets
M Dong, FF Chen
Robotics and Computer-Integrated Manufacturing 17 (1-2), 121-129, 2001
1512001
Decision support for lean practitioners: A web-based adaptive assessment approach
FF Chen
Computers in Industry 60 (4), 277-283, 2009
1442009
Decentralized supply chain planning framework for third party logistics partnership
H Jung, FF Chen, B Jeong
Computers & Industrial Engineering 55 (2), 348-364, 2008
1252008
Service optimal selection and composition in cloud manufacturing: a comprehensive survey
H Bouzary, F Frank Chen
The International Journal of Advanced Manufacturing Technology 97, 795-808, 2018
1102018
Performance modeling and analysis of integrated logistic chains: An analytic framework
M Dong, FF Chen
European Journal of Operational Research 162 (1), 83-98, 2005
1102005
The state of the art in intelligent real-time FMS control: a comprehensive survey
CS Shukla, F Frank Chen
Journal of intelligent Manufacturing 7, 441-455, 1996
1071996
Single-machine-based joint optimization of predictive maintenance planning and production scheduling
Q Liu, M Dong, FF Chen
Robotics and computer-integrated manufacturing 51, 238-247, 2018
972018
Grouping parts and tools in flexible manufacturing systems production planning
JA Ventura, F Frank Chen, CH Wu
THE INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH 28 (6), 1039-1056, 1990
911990
Framework for the control of automated material-handling systems using the holonic manufacturing approach
RF Babiceanu, FF Chen*, RH Sturges
International Journal of Production Research 42 (17), 3551-3564, 2004
902004
Single-machine-based joint optimization of predictive maintenance planning and production scheduling
Q Liu, M Dong, FF Chen, W Lv, C Ye
Robotics and computer-integrated manufacturing 55, 173-182, 2019
872019
Continuous improvement of knowledge management systems using Six Sigma methodology
CJ Lin, FF Chen, YM Chen, G Kuriger
Robotics and Computer-Integrated Manufacturing 29 (3), 95-103, 2013
792013
A hybrid grey wolf optimizer algorithm with evolutionary operators for optimal QoS-aware service composition and optimal selection in cloud manufacturing
H Bouzary, F Frank Chen
The International Journal of Advanced Manufacturing Technology 101, 2771-2784, 2019
722019
Sistem, işlemi şu anda gerçekleştiremiyor. Daha sonra yeniden deneyin.
Makaleler 1–20