Flow shop scheduling problems with assembly operations: a review and new trends BM GM Komaki, S Sheikh International Journal of Production Research, 2019 | 146 | 2019 |
Data-driven predictive models for residential building energy use based on the segregation of heating and cooling days E Kamel, S Sheikh, X Huang Energy 206, 118045, 2020 | 73 | 2020 |
Multi-objective OLSR for proactive routing in MANET with delay, energy, and link lifetime predictions Z Guo, S Malakooti, S Sheikh, C Al-Najjar, B Malakooti Applied Mathematical Modelling 35 (3), 1413-1426, 2011 | 66 | 2011 |
A genetic algorithm for solving no-wait flexible flow lines with due window and job rejection F Jolai, S Sheikh, M Rabbani, B Karimi The International Journal of Advanced Manufacturing Technology 42, 523-532, 2009 | 56 | 2009 |
Energy aware proactive optimized link state routing in mobile ad-hoc networks Z Guo, S Malakooti, S Sheikh, C Al-Najjar, M Lehman, B Malakooti Applied Mathematical Modelling 35 (10), 4715-4729, 2011 | 55 | 2011 |
Mobile ad hoc network broadcasting: A multi‐criteria approach BJ Barritt, S Sheikh, C Al‐Najjar, B Malakooti International Journal of Communication Systems 24 (4), 438-460, 2011 | 35 | 2011 |
Multi objective two-stage assembly flow shop with release time S Sheikh, GM Komaki, V Kayvanfar Computers & Industrial Engineering 124, 276-292, 2018 | 31 | 2018 |
Mobile ad hoc network proactive routing with delay prediction using neural network Z Guo, S Sheikh, C Al-Najjar, H Kim, B Malakooti Wireless Networks 16, 1601-1620, 2010 | 31 | 2010 |
Multi-Stage assembly flow shop with setup time and release time S Sheikh, GM Komaki, V Kayvanfar, E Teymourian Operations Research Perspectives 6, 100111, 2019 | 29 | 2019 |
Multi-objective energy aware multiprocessor scheduling using bat intelligence B Malakooti, S Sheikh, C Al-Najjar, H Kim Journal of Intelligent Manufacturing 24, 805-819, 2013 | 29 | 2013 |
Bat intelligence search with application to multi-objective multiprocessor scheduling optimization B Malakooti, H Kim, S Sheikh The International Journal of Advanced Manufacturing Technology 60, 1071-1086, 2012 | 26 | 2012 |
A Hybrid Harmony Search algorithm to minimize total weighted tardiness in the permutation flow shop M Komaki, S Sheikh, E Teymourian 2014 IEEE Symposium on Computational Intelligence in Production and …, 2014 | 21 | 2014 |
A collaborative decision support system for multi-criteria automatic clustering M Jabbari, S Sheikh, M Rabiee, A Oztekin Decision Support Systems 153, 113671, 2022 | 19 | 2022 |
A general variable neighborhood search algorithm to minimize makespan of the distributed permutation flowshop scheduling problem GM Komaki, S Mobin, E Teymourian, S Sheikh International Journal of Industrial and Manufacturing Engineering 9 (8 …, 2015 | 19 | 2015 |
An improved optimization method based on the intelligent water drops algorithm for the vehicle routing problem Z Booyavi, E Teymourian, GM Komaki, S Sheikh 2014 IEEE symposium on computational intelligence in production and …, 2014 | 19 | 2014 |
Multi-objective flexible flow lines with due window, time lag, and job rejection S Sheikh The International Journal of Advanced Manufacturing Technology 64, 1423-1433, 2013 | 18 | 2013 |
A new model for operating room scheduling with elective patient strategy RI Vahid Kayvanfar,Mohammad R. Akbari Jokar,Majid Rafiee,Shaya Sheikh INFOR: Information Systems and Operational Research, 2021 | 16 | 2021 |
An integrated decision support system for multi-target forecasting: A case study of energy load prediction for a solar-powered residential house S Sheikh, M Rabiee, M Nasir, A Oztekin Computers & Industrial Engineering 166, 107966, 2022 | 11 | 2022 |
Integrated risk and multi-objective optimization of energy systems S Sheikh, M Komaki, B Malakooti Computers & Industrial Engineering 90, 1-11, 2015 | 11 | 2015 |
Integrated energy systems with multi-objective S Sheikh, B Malakooti IEEE 2011 EnergyTech, 1-5, 2011 | 8 | 2011 |