Particle swarm optimization for parameter determination and feature selection of support vector machines SW Lin, KC Ying, SC Chen, ZJ Lee Expert systems with applications 35 (4), 1817-1824, 2008 | 1133 | 2008 |
An intelligent algorithm with feature selection and decision rules applied to anomaly intrusion detection SW Lin, KC Ying, CY Lee, ZJ Lee Applied Soft Computing 12 (10), 3285-3290, 2012 | 296 | 2012 |
An ant colony system for permutation flow-shop sequencing KC Ying, CJ Liao Computers & Operations Research 31 (5), 791-801, 2004 | 257 | 2004 |
Applying hybrid meta-heuristics for capacitated vehicle routing problem SW Lin, ZJ Lee, KC Ying, CY Lee Expert Systems with Applications 36 (2), 1505-1512, 2009 | 214 | 2009 |
Minimising makespan in distributed permutation flowshops using a modified iterated greedy algorithm SW Lin, KC Ying, CY Huang International Journal of Production Research 51 (16), 5029-5038, 2013 | 202 | 2013 |
Minimizing makespan for the distributed hybrid flowshop scheduling problem with multiprocessor tasks KC Ying, SW Lin Expert systems with applications 92, 132-141, 2018 | 152 | 2018 |
Multiprocessor task scheduling in multistage hybrid flow-shops: an ant colony system approach KC Ying, SW Lin International Journal of Production Research 44 (16), 3161-3177, 2006 | 135 | 2006 |
An enhanced ant colony optimization (EACO) applied to capacitated vehicle routing problem CY Lee, ZJ Lee, SW Lin, KC Ying Applied Intelligence 32, 88-95, 2010 | 125 | 2010 |
Dynamic parallel machine scheduling with sequence-dependent setup times using an iterated greedy heuristic KC Ying, HM Cheng Expert Systems with Applications 37 (4), 2848-2852, 2010 | 112 | 2010 |
Makespan minimization for scheduling unrelated parallel machines with setup times KC Ying, ZJ Lee, SW Lin Journal of Intelligent Manufacturing 23, 1795-1803, 2012 | 111 | 2012 |
Robust scheduling on a single machine to minimize total flow time CC Lu, SW Lin, KC Ying Computers & Operations Research 39 (7), 1682-1691, 2012 | 111 | 2012 |
Optimization of makespan for no-wait flowshop scheduling problems using efficient matheuristics SW Lin, KC Ying Omega 64, 115-125, 2016 | 108 | 2016 |
Minimizing makespan for solving the distributed no-wait flowshop scheduling problem SW Lin, KC Ying Computers & Industrial Engineering 99, 202-209, 2016 | 106 | 2016 |
Iterated reference greedy algorithm for solving distributed no-idle permutation flowshop scheduling problems KC Ying, SW Lin, CY Cheng, CD He Computers & Industrial Engineering 110, 413-423, 2017 | 101 | 2017 |
Real-time relief distribution in the aftermath of disasters–A rolling horizon approach CC Lu, KC Ying, HJ Chen Transportation research part E: logistics and transportation review 93, 1-20, 2016 | 100 | 2016 |
ABC-based manufacturing scheduling for unrelated parallel machines with machine-dependent and job sequence-dependent setup times SW Lin, KC Ying Computers & Operations Research 51, 172-181, 2014 | 94 | 2014 |
Sequencing single-machine tardiness problems with sequence dependent setup times using an iterated greedy heuristic KC Ying, SW Lin, CY Huang Expert Systems with Applications 36 (3), 7087-7092, 2009 | 92 | 2009 |
Solving single-machine total weighted tardiness problems with sequence-dependent setup times by meta-heuristics SW Lin, KC Ying The International Journal of Advanced Manufacturing Technology 34, 1183-1190, 2007 | 89 | 2007 |
Minimizing makespan in a blocking flowshop using a revised artificial immune system algorithm SW Lin, KC Ying Omega 41 (2), 383-389, 2013 | 85 | 2013 |
Minimizing makespan and total flowtime in permutation flowshops by a bi-objective multi-start simulated-annealing algorithm SW Lin, KC Ying Computers & Operations Research 40 (6), 1625-1647, 2013 | 79 | 2013 |