Cost calculation of construction projects including sustainability factors using the Case Based Reasoning (CBR) method A Leśniak, K Zima Sustainability 10 (5), 1608, 2018 | 108 | 2018 |
A SWOT analysis of the use of BIM technology in the polish construction industry K Zima, E Plebankiewicz, D Wieczorek Buildings 10 (1), 16, 2020 | 99 | 2020 |
Fuzzy AHP application for supporting contractors’ bidding decision A Leśniak, D Kubek, E Plebankiewicz, K Zima, S Belniak Symmetry 10 (11), 642, 2018 | 97 | 2018 |
Scan-to-BIM method in construction: assessment of the 3D buildings model accuracy in terms inventory measurements I Skrzypczak, G Oleniacz, A Leśniak, K Zima, M Mrówczyńska, JK Kazak Building Research & Information 50 (8), 859-880, 2022 | 87 | 2022 |
ANN based approach for estimation of construction costs of sports fields M Juszczyk, A Leśniak, K Zima Complexity 2018 (1), 7952434, 2018 | 81 | 2018 |
Life cycle cost modelling of buildings with consideration of the risk E Plebankiewicz, K Zima, D Wieczorek Archives of Civil Engineering 62 (2), 2016 | 74 | 2016 |
Analysis of the first Polish BIM-Based cost estimation application E Plebankiewicz, K Zima, M Skibniewski Procedia Engineering 123, 405-414, 2015 | 74 | 2015 |
Errors in the preparation of design documentation in public procurement in Poland M Juszczyk, R Kozik, A Leśniak, E Plebankiewicz, K Zima Procedia Engineering 85, 283-292, 2014 | 57 | 2014 |
The influence of the building shape on the costs of its construction S Belniak, A Leśniak, E Plebankiewicz, K Zima Journal of Financial Management of Property and Construction 18 (1), 90-102, 2013 | 57 | 2013 |
Prospects for the use of BIM in Poland and the Czech Republic–Preliminary research results M Juszczyk, M Výskala, K Zima Procedia Engineering 123, 250-259, 2015 | 56 | 2015 |
The case-based reasoning model of cost estimation at the preliminary stage of a construction project K Zima Procedia Engineering 122, 57-64, 2015 | 53 | 2015 |
Impact of information included in the BIM on preparation of Bill of Quantities K Zima Procedia engineering 208, 203-210, 2017 | 48 | 2017 |
Forecasting of sports fields construction costs aided by ensembles of neural networks M Juszczyk, K Zima, W Lelek Journal of Civil Engineering and Management 25 (7), 715-729, 2019 | 47 | 2019 |
Design and build procurement system–contractor selection A Leśniak, E Plebankiewicz, K Zima Archives of Civil Engineering 58 (4), 463-476, 2012 | 47 | 2012 |
Evaluation of planned construction projects using fuzzy logic M Gajzler, K Zima International Journal of Civil Engineering 15, 641-652, 2017 | 41 | 2017 |
Modelling of time, cost and risk of construction with using fuzzy logic E Plebankiewicz, K Zima, D Wieczorek Journal of Civil Engineering and Management 27 (6), 412-426, 2021 | 34 | 2021 |
Model estimation of the whole life cost of a building with respect to risk factors D Wieczorek, E Plebankiewicz, K Zima Technological and Economic Development of Economy 25 (1), 20-38, 2019 | 33 | 2019 |
Probabilistic and fuzzy approaches for estimating the life cycle costs of buildings under conditions of exposure to risk E Plebankiewicz, W Meszek, K Zima, D Wieczorek Sustainability 12 (1), 226, 2019 | 32 | 2019 |
Comparison of traditional and ecological wall systems using the AHP method K Zima International Multidisciplinary Scientific GeoConference: SGEM 5 (3), 157-164, 2015 | 28 | 2015 |
Quantification of the risk addition in life cycle cost of a building object E Plebankiewicz, K Zima Technical Transactions 2017 (Year 2017 (114)), 35-45, 2017 | 23 | 2017 |