Finding some essential characteristics of the feasible solutions for a scheduling problem J Erschler, F Roubellat, JP Vernhes Operations Research 24 (4), 774-783, 1976 | 119 | 1976 |
A New Dominance Concept in Scheduling n Jobs on a Single Machine with Ready Times and Due Dates J Erschler, G Fontan, C Mercé, F Roubellat Operations Research 31 (1), 114-127, 1983 | 104 | 1983 |
Consistency of the disaggregation process in hierarchical planning J Erschler, G Fontan, C Mercé Operations Research 34 (3), 464-469, 1986 | 92 | 1986 |
Raisonnement temporel sous contraintes de ressource et problèmes d'ordonnancement J Erschler, P Lopez, C Thuriot Revue d'intelligence artificielle 5 (3), 7-32, 1991 | 87 | 1991 |
Decision-aid in job shop scheduling: A knowledge based approach J Erschler, P Esquirol Proceedings. 1986 IEEE International Conference on Robotics and Automation 3 …, 1986 | 87 | 1986 |
Ordonnancement de tâches sous contraintes: une approche énergétique P Lopez, J Erschler, P Esquirol Automatique-productique informatique industrielle 26 (5-6), 453-481, 1992 | 81 | 1992 |
Periodic loading of flexible manufacturing systems J ERSCHELER Proc. of the IFIP Congress, APMS, Bordeaux, France, 327-339, 1982 | 73 | 1982 |
Analyse sous contraintes et aide à la décision pour certains problèmes d'ordonnancement J Erschler Université de Toulouse, 1976 | 70 | 1976 |
Les problèmes d'ordonnancement J Carlier, P Chrétienne, J Erschler, C Hanen, P Lopez, A Munier, E Pinson, ... RAIRO-Operations Research 27 (1), 77-150, 1993 | 66 | 1993 |
Automation of a hydroelectric power station using variable-structure control systems J Erschler, F Roubellat, JP Vernhes Automatica 10 (1), 31-36, 1974 | 55 | 1974 |
Characterizing the set of feasible sequences for n jobs to be carried out on a single machine J Erschler, F Roubellat, JP Vernhes European Journal of Operational Research 4 (3), 189-194, 1980 | 52 | 1980 |
A knowledge-based approach to industrial job-shop scheduling G Bel, E Bensana, D Dubois, J Erschler, P Esquirol Knowledge-based systems in manufacturing, 207--246, 1989 | 47 | 1989 |
Energy-based approach for task scheduling under time and resources constraints J Erschler, P Lopez 2nd international workshop on project management and scheduling, 115-121, 1990 | 45 | 1990 |
A robust approach for the single machine scheduling problem C Briand, HT La, J Erschler Journal of Scheduling 10, 209-221, 2007 | 41 | 2007 |
Steady state scheduling of a flexible manufacturing system with periodic releasing and flow time constraints J Erschler, F Roubellat, C Thuriot Annals of Operations Research 3, 333-353, 1985 | 36 | 1985 |
AN APPROACH FOR REAL TIME SCHEDULING OF ACTIVITIES WITH TIME AND RESOURCE CONSTRAINTS J Erschler, F Roubellat Advances in project scheduling, 237-272, 1989 | 29 | 1989 |
A new sufficient condition of optimality for the two-machine flowshop problem C Briand, HT La, J Erschler European Journal of Operational Research 169 (3), 712-722, 2006 | 26 | 2006 |
Negotiation based on constraints in cooperation MJ Huguet, J Erschler, G De Terssac, N Lompré Computer Supported Cooperative Work (CSCW) 5, 267-284, 1996 | 24 | 1996 |
A decision-making process for the real time control of a production unit J Erschler, F Roubellat, JP Vernhes THE INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH 14 (2), 275-284, 1976 | 24 | 1976 |
Approche par contraintes pour l’aide aux décisions d’ordonnancement J Erschler, C Thuriot Les nouvelles rationalisations de la production, 249-266, 1992 | 22 | 1992 |