关注
Min Cheng (程敏)
Min Cheng (程敏)
在 cqu.edu.cn 的电子邮件经过验证
标题
引用次数
引用次数
年份
Pump/valves coordinate control of the independent metering system for mobile machinery
B Xu, R Ding, J Zhang, M Cheng, T Sun
Automation in Construction 57, 98-111, 2015
1042015
Active fault-tolerant control for electro-hydraulic systems with an independent metering valve against valve faults
R Ding, M Cheng, L Jiang, G Hu
IEEE Transactions on Industrial Electronics 68 (8), 7221-7232, 2020
822020
Motion control of multi-actuator hydraulic systems for mobile machineries: Recent advancements and future trends
B Xu, M Cheng
Frontiers of Mechanical Engineering 13, 151-166, 2018
672018
Energy efficiency improvement of heavy-load mobile hydraulic manipulator with electronically tunable operating modes
R Ding, J Zhang, B Xu, M Cheng, M Pan
Energy Conversion and Management 188, 447-461, 2019
662019
A hybrid displacement/pressure control scheme for an electrohydraulic flow matching system
B Xu, M Cheng, H Yang, J Zhang, C Sun
IEEE/ASME transactions on Mechatronics 20 (6), 2771-2782, 2015
622015
Decoupling compensation for damping improvement of the electrohydraulic control system with multiple actuators
M Cheng, J Zhang, B Xu, R Ding, J Wei
IEEE/ASME Transactions on Mechatronics 23 (3), 1383-1392, 2018
572018
An Electrohydraulic Load Sensing System based on flow/pressure switched control for mobile machinery
M Cheng, J Zhang, B Xu, R Ding
ISA transactions 96, 367-375, 2020
562020
Self-tuning pressure-feedback control by pole placement for vibration reduction of excavator with independent metering fluid power system
R Ding, B Xu, J Zhang, M Cheng
Mechanical Systems and Signal Processing 92, 86-106, 2017
532017
Bumpless mode switch of independent metering fluid power system for mobile machinery
R Ding, B Xu, J Zhang, M Cheng
Automation in Construction 68, 52-64, 2016
532016
Programmable hydraulic control technique in construction machinery: Status, challenges and countermeasures
R Ding, J Zhang, B Xu, M Cheng
Automation in Construction 95, 172-192, 2018
512018
Human–robot shared control based on locally weighted intent prediction for a teleoperated hydraulic manipulator system
S Luo, M Cheng, R Ding, F Wang, B Xu, B Chen
IEEE/ASME Transactions on Mechatronics 27 (6), 4462-4474, 2022
452022
Development of a redundant anthropomorphic hydraulically actuated manipulator with a roll-pitch-yaw spherical wrist
M Cheng, Z Han, R Ding, J Zhang, B Xu
Frontiers of mechanical engineering, 1-13, 2021
372021
Hydro-mechanical power split transmissions: Progress evolution and future trends
J Yu, Z Cao, M Cheng, R Pan
Proceedings of the Institution of Mechanical Engineers, Part D: Journal of …, 2019
372019
Multiphysics-coupled modeling: Simulation of the hydraulic-operating mechanism for a sf6 high-voltage circuit breaker
B Xu, R Ding, J Zhang, L Sha, M Cheng
IEEE/ASME Transactions on Mechatronics 21 (1), 379-393, 2015
372015
Pump-based compensation for dynamic improvement of the electrohydraulic flow matching system
M Cheng, B Xu, J Zhang, R Ding
IEEE Transactions on Industrial Electronics 64 (4), 2903-2913, 2016
342016
A flow-limited rate control scheme for the master–slave hydraulic manipulator
F Zhang, J Zhang, M Cheng, B Xu
IEEE Transactions on Industrial Electronics 69 (5), 4988-4998, 2021
322021
Sensor-fault-tolerant operation for the independent metering control system
R Ding, M Cheng, S Zheng, B Xu
IEEE/ASME Transactions on Mechatronics 26 (5), 2558-2569, 2020
272020
Safety brake performance evaluation and optimization of hydraulic lifting systems in case of overspeed dropping
B Xu, M Cheng, H Yang, J Zhang, M Yang
Mechatronics 23 (8), 1180-1190, 2013
262013
Dynamic impact of hydraulic systems using pressure feedback for active damping
M Cheng, S Luo, R Ding, B Xu, J Zhang
Applied Mathematical Modelling 89, 454-469, 2021
252021
基于流量前馈与压力反馈复合控制的电液负载敏感系统
程敏, 于今, 丁孺琦, 蔡乐平
机械工程学报 54 (20), 262-270, 2018
152018
系统目前无法执行此操作,请稍后再试。
文章 1–20