Filosofía Lean Construction para la gestión de proyectos de construcción: Una revisión actual
H Porras, O Sánchez, J Galvis
AVANCES Investigación en Ingeniería 11 (1), 32-53, 2014
292*2014
Cost overrun causative factors in road infrastructure projects: A frequency and importance analysis
RF Herrera, O Sánchez, K Castañeda, H Porras
Applied Sciences 10 (16), 5506, 2020
1212020
Tecnologías" Building Information Modeling" en la elaboración de presupuestos de construcción de estructuras en concreto reforzado
H Porras-Díaz, OG Sánchez-Rivera, JA Galvis-Guerra, NA Jaimez-Plata, ...
Entramado 11 (1), 230-249, 2015
71*2015
BIM-based traffic analysis and simulation at road intersection design
K Castañeda, O Sánchez, RF Herrera, E Pellicer, H Porras
Automation in Construction 131, 103911, 2021
632021
Highway planning trends: a bibliometric analysis
K Castañeda, O Sánchez, RF Herrera, G Mejía
Sustainability 14 (9), 5544, 2022
492022
Delay causes in road infrastructure projects in developing countries
G Mejía, O Sánchez, K Castañeda, E Pellicer
Revista de la Construcción 19 (2), 220-234, 2020
482020
Planificación de recursos humanos a partir de la simulación del proceso constructivo en modelos BIM 5D
JJ Bohórquez-Castellanos, H Porras-Díaz, OG Sánchez-Rivera, ...
Entramado 14 (1), 252-267, 2018
412018
Metodología para la elaboración de modelos del proceso constructivo 5d con tecnologías “building information modeling”
HP Díaz, OGS Rivera, JAG Guerra
Revista Gti 14 (38), 59-73, 2015
342015
Planificación del flujo de caja de proyectos de construcción basada en BIM y dinámica de sistemas
KM Castañeda-Parra, OG Sánchez-Rivera, H Porras-Díaz
Entramado 17 (1), 272-288, 2021
302021
ßrIM 5D models and Lean Construction for planning work activities in reinforced concrete bridges
OG Sánchez-Rivera, JA Galvis-Guerra, H Porras-Díaz, YD Ardila-Chacón, ...
Revista Facultad de Ingeniería 26 (46), 39-50, 2017
222017
Paper Planes for Teaching Construction Production Systems Based on Lean Tools: Continuous Improvement Cells and 5S
O Sánchez, MP Revuelta, A Gómez-Cabrera, LA Salazar
Buildings 13 (2), 558, 2023
162023
Building Information Modeling and Complementary Technologies in Heritage Buildings: A Bibliometric Analysis
A Puerto, K Castañeda, O Sánchez, CA Peña, L Gutiérrez, P Sáenz
Results in Engineering, 102192, 2024
142024
Delay factors: A comparative analysis between road infrastructure and building projects
O Sánchez, K Castañeda, G Mejía, E Pellicer
Construction Research Congress 2020, 223-231, 2020
132020
Digitalization and sustainability in linear projects trends: a bibliometric analysis
NE Lozano-Ramírez, O Sánchez, D Carrasco-Beltrán, S Vidal-Méndez, ...
Sustainability 15 (22), 15962, 2023
122023
Benefits of building information modeling in road projects for cost overrun factors mitigation
O Sánchez, K Castañeda, RF Herrera, E Pellicer
Construction Research Congress 2022, 472-482, 2022
112022
Influence of BIM and Lean on mitigating delay factors in building projects
Y Pérez, J Ávila, O Sánchez
Results in Engineering 22, 102236, 2024
92024
Building Information Modeling Uses and Complementary Technologies in Road Projects: A Systematic Review
K Castañeda, O Sánchez, RF Herrera, A Gómez-Cabrera, G Mejía
Buildings 14 (3), 563, 2024
82024
Value generation analysis within the design process of construction projects in Chile
Z Giménez, RF Herrera, O Sánchez
Ain Shams Engineering Journal 15 (1), 102332, 2024
82024
Stakeholders’ issues as a source of project delays: a meta-analysis between building and road projects
G Mejía, O Sánchez, K Castañeda, E Pellicer
Revista de la construcción 22 (1), 51-73, 2023
82023
Benefits of Last Planner® System in mitigation of delay causes in road infrastructure projects
OG Sánchez, KM Castañeda, RF Herrera, E Pellicer
SIMPÓSIO BRASILEIRO DE GESTÃO E ECONOMIA DA CONSTRUÇÃO 11, 1-8, 2019