Parallel genetic algorithm based automatic path planning for crane lifting in complex environments
Heavy lifting is a common and important task in industrial plants. It is conducted frequently
during the time of plant construction, maintenance shutdown and new equipment …
during the time of plant construction, maintenance shutdown and new equipment …
Lift planning and optimization in construction: A thirty-year review
Various lift planning and optimization (LPO) researches have been conducted; nevertheless,
the body of knowledge is fragmented. This study aims to develop a systematic framework of …
the body of knowledge is fragmented. This study aims to develop a systematic framework of …
Evaluating mobile crane lift operations using an interactive virtual reality system
Cranes are one of the most critical and expensive pieces of construction industry equipment
requiring intense safety considerations. Lifting crews should attempt to develop an effective …
requiring intense safety considerations. Lifting crews should attempt to develop an effective …
VP-based safety management in large-scale construction projects: A conceptual framework
HL Guo, H Li, V Li - Automation in construction, 2013 - Elsevier
Construction safety is a serious problem in the construction industry worldwide, especially in
large-scale construction projects. In order to improve the safety management performance …
large-scale construction projects. In order to improve the safety management performance …
Integrating 3D visualization and simulation for tower crane operations on construction sites
Most high-rise building construction projects rely on tower cranes to perform lifting and
hoisting activities. In practice, tower cranes are managed based on demand, urgency, and …
hoisting activities. In practice, tower cranes are managed based on demand, urgency, and …
Automated crane planning and optimization for modular construction
The majority of industrial projects in Alberta's oil sands are constructed using modular
construction. Modules are preassembled components built off-site and transported to the site …
construction. Modules are preassembled components built off-site and transported to the site …
Virtual reality supported interactive tower crane layout planning for high-rise modular integrated construction
Tower crane layout planning (TCLP) is critical to achieving safe and efficient module
installation for high-rise modular integrated construction (MiC). Nevertheless, the existing …
installation for high-rise modular integrated construction (MiC). Nevertheless, the existing …