[HTML][HTML] Automated vision-based construction progress monitoring in built environment through digital twin
Effective progress monitoring is ineviTable for completing the construction of building and
infrastructure projects successfully. In this digital transformation era, with the data-centric …
infrastructure projects successfully. In this digital transformation era, with the data-centric …
[HTML][HTML] Moving toward lean construction through automation of planning and control in last planner system: A systematic literature review
Abstract The Last Planner System (LPS) is a production planning and control system based
on Lean Construction (LC) principles. Effectively implementing the LPS in the construction …
on Lean Construction (LC) principles. Effectively implementing the LPS in the construction …
Activity-level construction progress monitoring through semantic segmentation of 3D-informed orthographic images
Effective progress monitoring is crucial for successful construction project delivery. Visual
data, comprising images and videos of construction operations, has emerged as a valuable …
data, comprising images and videos of construction operations, has emerged as a valuable …
Transformer language model for map** construction schedule activities to uniformat categories
Creating consistency among project schedule data, BIM, and payment applications requires
activities in a construction schedule to be mapped with the most relevant ASTM Uniformat …
activities in a construction schedule to be mapped with the most relevant ASTM Uniformat …
Transformer machine learning language model for auto-alignment of long-term and short-term plans in construction
In construction, master schedules and look-ahead plans are created at different times
(monthly vs. weekly), by different personas (planner vs. superintendent), with different …
(monthly vs. weekly), by different personas (planner vs. superintendent), with different …
[HTML][HTML] Enhancing construction project workflow reliability through observe–plan–do–check–react cycle: A bridge project case study
A Javanmardi, C He, SM Hsiang… - Buildings, 2023 - mdpi.com
This research aims to determine the appropriate level of effort required for each step of the
Observe–Plan–Do–Check–React (OPDCA) cycle to improve the workflow reliability of a …
Observe–Plan–Do–Check–React (OPDCA) cycle to improve the workflow reliability of a …
Adopting BIM to facilitate dispute management in the construction industry: A conceptual framework development
Previous studies revealed that Building Information Modeling (BIM) has the potential to
reduce project uncertainties, design errors, change orders, and delays, which might facilitate …
reduce project uncertainties, design errors, change orders, and delays, which might facilitate …
Exploring the adoption of technology against delays in construction projects
Purpose Completing construction projects within the planned schedule has widely been
considered as one of the major project success factors. This study investigates the use of …
considered as one of the major project success factors. This study investigates the use of …
Functionality as a key concept for integrated project planning and scheduling methods
M Sheikhkhoshkar, H Bril El-Haouzi… - Journal of …, 2023 - ascelibrary.org
The construction industry has made significant efforts to address the issues of low
productivity caused by inefficient construction planning and scheduling. This issue led to …
productivity caused by inefficient construction planning and scheduling. This issue led to …
An advanced exploration of functionalities as the underlying principles of construction control metrics
Purpose In academics and industry, significant efforts have been made to lead planners and
control teams in evaluating project performance and control. In this context, numerous …
control teams in evaluating project performance and control. In this context, numerous …