Systems integration and collaboration in architecture, engineering, construction, and facilities management: A review

W Shen, Q Hao, H Mak, J Neelamkavil, H **e… - Advanced engineering …, 2010 - Elsevier
With the rapid advancement of information and communication technologies, particularly
Internet and Web-based technologies during the past 15 years, various systems integration …

Collaborative model: Managing design changes with reusable project experiences through project learning and effective communication

JBH Yap, H Abdul-Rahman, W Chen - International Journal of Project …, 2017 - Elsevier
This paper empirically studies the importance of managing design changes in dealing with
time delay and cost overruns in construction projects. The main objective of this paper is to …

System dynamics approach for forecasting performance of construction projects

H Leon, H Osman, M Georgy… - Journal of Management in …, 2018 - ascelibrary.org
Accurate and reliable prediction of project performance is critical to the success of
construction projects and companies alike. Such prediction assists in obtaining early …

Project management and system dynamics modelling: Time to connect with innovation and sustainability

JA Calderon‐Tellez, G Bell… - Systems Research …, 2024 - Wiley Online Library
This paper argues that there is a requirement to connect project management (PM) with
innovation and sustainability to address new societal needs. Societal demands have …

Automated identification of substantial changes in construction projects of airport improvement program: Machine learning and natural language processing …

R Khalef, IH El-adaway - Journal of management in engineering, 2021 - ascelibrary.org
Contractual changes—mainly substantial changes—within airport improvement program
(AIP) projects represent a critical risk that could result in severe negative time and cost …

Construction project change management in Singapore: Status, importance and impact

BG Hwang, LK Low - International journal of project management, 2012 - Elsevier
Changes in construction projects are inevitable. In order to minimize the impact of changes
on a project, it is imperative to implement change management. This study aims to assess …

A BIM-based approach for DfMA in building construction: framework and first results on an Italian case study

E Alfieri, E Seghezzi, M Sauchelli… - Architectural …, 2020 - Taylor & Francis
This research presents a framework to integrate Design for Manufacture and Assembly
(DfMA) approach in the Italian Architecture, Engineering and Construction (AEC) context …

Managing construction projects through dynamic modeling: Reviewing the existing body of knowledge and deriving future research directions

IS Abotaleb, IH El-adaway - Journal of management in engineering, 2018 - ascelibrary.org
To improve decision making in construction projects, dynamic models have been developed
to grasp the complex project dynamics that traditional scheduling and decision-making …

BIM-based framework to quantify delays and cost overruns due to changes in construction projects

D Honnappa, SPS Padala - Asian Journal of Civil Engineering, 2022 - Springer
Abstract Architecture, Engineering, and Construction (AEC) projects are inherently complex,
risky in nature, and difficult to manage. Due to fragmented nature of design-construction …

Prediction system for change management in construction project

ZY Zhao, QL Lv, J Zuo, G Zillante - Journal of Construction …, 2010 - ascelibrary.org
Changes are the main causes of delays and cost overruns in construction projects. Various
change management systems have been developed to minimize the impacts of changes …