[HTML][HTML] Identifying major challenges in managing post-disaster reconstruction projects: A critical analysis

A Puri, M Elkharboutly, NA Ali - International Journal of Disaster Risk …, 2024 - Elsevier
This paper seeks to identify and categorise challenges encountered in managing post-
disaster reconstruction projects. Literature relevant to the topic was identified using …

Develo** a community responsive resilient contractor selection model for post-disaster reconstruction projects: a build back better approach

FS Demirci, Z Isik - Engineering, Construction and Architectural …, 2024 - emerald.com
Purpose This study aims to develop a resilient contractor selection model that also considers
community concerns in post-disaster reconstruction projects using a “build-back better …

Seismic Liquefaction Potential of Fluvio-Lacustrine Deposit in the Kathmandu Valley, Nepal

P Acharya, K Sharma, IP Acharya… - Geotechnical and …, 2023 - Springer
Valleys containing Fluvial-lacustrine deposits with shallow groundwater are susceptible to
seismic liquefaction. In fact, extensive liquefaction was observed in the Kathmandu Valley …

Comparative analysis of urban and rural housing reconstruction post 9.21 Chi-Chi and 5.12 Wenchuan earthquakes: complexity, challenges and policy exploration

Q Li, K Umaier, Y Chen, O Koide - Disaster Prevention and …, 2024 - emerald.com
Purpose Due to significant differences between urban and rural areas in terms of
geographical environment, building scale, resident culture, social organization and other …

Reconnaissance of the Effects of the MW5.7 (ML6.4) Jajarkot Nepal Earthquake of 3 November 2023, Post-Earthquake Responses, and Associated Lessons to Be …

M Subedi, R KC, K Sharma, J Misra, A KC - Geosciences, 2024 - mdpi.com
On 3 November 2023, a moment magnitude (MW) 5.7 (Local Magnitude, M L6. 4)
earthquake struck the western region of Nepal, one of the most powerful seismic events …

Türkiye's Road to Recovery after the 2023 Kahramanmaras Earthquake: Lessons from Chile, Japan, and Nepal

P Acharya, K Sharma, F Liu - Natural Hazards Review, 2024 - ascelibrary.org
The 2023 Türkiye-Syria earthquake sequence is one of the biggest disasters Türkiye has
ever encountered. The loss of lives and properties by the earthquake indicates that the …

A Bayesian-Based Approach for Post-disaster Recovery Estimation Enhancement

P Acharya, Y Zhao, F Liu - International Conference on Construction …, 2023 - Springer
Each year, numerous disasters occur, challenging the resilience of societies worldwide. The
effective management of the intricate disaster recovery process necessitates well-prepared …

The Case of'Forgotten People'after the 2015 Nepal Earthquake

SK Aksha, P Acharya, S Bhat - The Routledge Handbook of …, 2025 - books.google.com
Nepal experienced a strong earthquake of a moment magnitude 7.8 (M) on 25 April 2015.
The epicenter was in Gorkha district in central Nepal, 80 km northwest of Kathmandu, the …

Suitability of FIDIC Contracts for Post-disaster Reconstruction of Infrastructure Projects

A Puri, NA Ali, M Elkharboutly - International Conference on Engineering …, 2023 - Springer
Abstract The Federation of Consulting Engineers (FIDIC) standard form of construction
contract (SFCC) is among the most used construction contracts globally. It is also highly …

Assessing building typology and seismic vulnerability of masonry structures built with government grant after 2015 Gorkha earthquake

N Koirala, NR Panta, P Adhikari… - … University Journal of …, 2024 - journals.ku.edu.np
This research investigates the current landscape of reconstructed building typologies and
assesses the vulnerability of masonry buildings reconstructed through government grants …