Acceptable risk criteria for infrastructure protection

MG Stewart - International Journal of Protective Structures, 2010 - journals.sagepub.com
This paper reviews risk-based approaches to assessing the risk acceptability and cost-
effectiveness of protective measures for infrastructure. The paper describes three risk …

Risk-informed decision support for assessing the costs and benefits of counter-terrorism protective measures for infrastructure

MG Stewart - International Journal of Critical Infrastructure Protection, 2010 - Elsevier
The paper describes risk-informed decision support for assessing the costs and benefits of
counter-terrorism (CT) protective measures for infrastructure. Such a decision support …

[PDF][PDF] A decision tool for accelerated bridge construction.

A Saeedi, S Emami, TL Doolen, B Tang - PCI journal, 2013 - pci.org
The US Department of Transportation's strategic plan for 2006–2011 identified the use of
decision-making tools as a key strategy to reduce congestion and deliver longer-lasting …

Measuring bridge construction efficiency using the wireless real-time video monitoring system

Y Bai, J Huan, S Kim - Journal of Management in Engineering, 2012 - ascelibrary.org
To enhance the efficiency of bridge construction, the wireless real-time video monitoring
system (WRITE) was developed. Utilizing the advanced technologies of computer vision and …

Terrorism risks for bridges in a multi-hazard environment

MG Stewart, J Mueller - International Journal of Protective …, 2014 - journals.sagepub.com
The paper will assess terrorist threats to new and existing bridges and the cost-effectiveness
of protective counter-terrorism measures. This analysis will consider threat likelihood, cost of …

Design optimization and structural performance evaluation of plate girder bridge constructed using a turn-over process

GH Eom, SJ Kim, TH Lee, JHJ Kim - Materials, 2017 - mdpi.com
A recent trend in bridge construction has been the optimization of the cost-to-performance
ratio. The most effective way to optimize the cost-to-performance ratio is to maximize the …

Development of human poses for the determination of on-site construction productivity in real-time

Y Bai, J Huan, A Peddi - 2008 - kuscholarworks.ku.edu
To enhance the capability of rapid construction, an automated on-site productivity
measurement system is developed. Employing the concepts of Computer Vision and …

Development of emergency track beam alignment for rapid track beam replacement of straddle monorail transit

M Zhong, E Zhu - Journal of transportation engineering, 2013 - ascelibrary.org
Prestressed concrete (PC) track beams are the important component of straddle monorail
transit systems. To ensure the normal operation of straddle monorail transit, a type of …

Rapid bridge deck replacement construction techniques: State of the practice

JN Flowers, WC Zech… - Transportation research …, 2010 - journals.sagepub.com
Rapid bridge deck replacement (RBDR) is the method of replacing a bridge deck using
innovative, alternative deck systems to perform needed repair under an accelerated …

[КНИГА][B] Bridge Maintenance, Safety, Management and Life Extension

A Chen, D Frangopol, X Ruan - 2014 - taylorfrancis.com
Bridge Maintenance, Safety, Management and Life Extension contains the lectures and
papers presented at IABMAS 2014, the Seventh International Conference on Bridge …