Optimal site selection of electric vehicle charging station by using fuzzy TOPSIS based on sustainability perspective

S Guo, H Zhao - Applied Energy, 2015 - Elsevier
Selecting the most sustainable site plays an important role in the life cycle of electric vehicle
charging station (EVCS), which needs to consider some conflicting criteria. Different from the …

Oversampling-based prediction of environmental complaints related to construction projects with imbalanced empirical-data learning

J Hong, H Kang, T Hong - Renewable and Sustainable Energy Reviews, 2020 - Elsevier
In this study, an oversampling-based method for optimally predicting complaints due to
environmental pollutants from construction sites was developed using imbalanced empirical …

[HTML][HTML] Bridging the gap: Reintegrating legal perspectives into project management

A Castro, T Sainati - Project Leadership and Society, 2024 - Elsevier
While legal topics have been acknowledged by project management academics, scholarly
engagement between project management and the law needs to be further developed. This …

Analysis of delays in Tanzanian construction industry: Transaction cost economics (TCE) and structural equation modeling (SEM) approach

M Sambasivan, TJ Deepak, AN Salim… - Engineering …, 2017 - emerald.com
Purpose The purpose of this paper is twofold: first, to develop theoretical underpinnings
using TCE, and second, to run the analysis using an advanced tool such as structural …

Selection and use of alternative dispute resolution (ADR) in construction projects—Past and future research

CK Lee, TW Yiu, SO Cheung - International Journal of Project Management, 2016 - Elsevier
Abstract Research on Alternative Dispute Resolution (ADR) selection and use has been
gaining prevalent interest from project practitioners and researchers. This study presents a …

Impacts of risk allocation on conflict negotiation costs in construction projects: Does managerial control matter?

Y Tang, Y Chen, Y Hua, Y Fu - International Journal of Project …, 2020 - Elsevier
The negotiation costs for project participants to resolve conflicts significantly undermine the
project performance, but how to reduce these costs remains largely unexplored. This study …

Causes of delays in the construction phase of Chinese building projects

TK Wang, DN Ford, HY Chong… - Engineering, Construction …, 2018 - emerald.com
Purpose Delays during construction are one of the common scenarios in the construction
industry. The purpose of this paper is to identify the primary causes of delays in the …

An analysis on promoting prefabrication implementation in construction industry towards sustainability

Z Wu, L Luo, H Li, Y Wang, G Bi… - International Journal of …, 2021 - mdpi.com
As a game-changing technology with significant environmental, economic, and social
benefits, prefabricated technology has attracted attention and has been increasingly …

Factors affecting transaction costs and collaboration in projects

H Haaskjold, B Andersen, O Lædre… - International Journal of …, 2020 - emerald.com
Purpose Transaction costs in projects can be reduced through improved collaboration
between contractors and clients. The purpose of this paper is to respond to the call for further …

[HTML][HTML] Development of a real-time noise estimation model for construction sites

G Lee, S Moon, J Hwang, S Chi - Advanced Engineering Informatics, 2023 - Elsevier
As construction noise negatively affects the health and quality of life of stakeholders, field
managers need to properly monitor and manage noise. Thus, the authors developed a …