Optimal site selection of electric vehicle charging station by using fuzzy TOPSIS based on sustainability perspective
S Guo, H Zhao - Applied Energy, 2015 - Elsevier
Selecting the most sustainable site plays an important role in the life cycle of electric vehicle
charging station (EVCS), which needs to consider some conflicting criteria. Different from the …
charging station (EVCS), which needs to consider some conflicting criteria. Different from the …
Oversampling-based prediction of environmental complaints related to construction projects with imbalanced empirical-data learning
In this study, an oversampling-based method for optimally predicting complaints due to
environmental pollutants from construction sites was developed using imbalanced empirical …
environmental pollutants from construction sites was developed using imbalanced empirical …
[HTML][HTML] Bridging the gap: Reintegrating legal perspectives into project management
While legal topics have been acknowledged by project management academics, scholarly
engagement between project management and the law needs to be further developed. This …
engagement between project management and the law needs to be further developed. This …
Analysis of delays in Tanzanian construction industry: Transaction cost economics (TCE) and structural equation modeling (SEM) approach
Purpose The purpose of this paper is twofold: first, to develop theoretical underpinnings
using TCE, and second, to run the analysis using an advanced tool such as structural …
using TCE, and second, to run the analysis using an advanced tool such as structural …
Selection and use of alternative dispute resolution (ADR) in construction projects—Past and future research
Abstract Research on Alternative Dispute Resolution (ADR) selection and use has been
gaining prevalent interest from project practitioners and researchers. This study presents a …
gaining prevalent interest from project practitioners and researchers. This study presents a …
Impacts of risk allocation on conflict negotiation costs in construction projects: Does managerial control matter?
Y Tang, Y Chen, Y Hua, Y Fu - International Journal of Project …, 2020 - Elsevier
The negotiation costs for project participants to resolve conflicts significantly undermine the
project performance, but how to reduce these costs remains largely unexplored. This study …
project performance, but how to reduce these costs remains largely unexplored. This study …
Causes of delays in the construction phase of Chinese building projects
Purpose Delays during construction are one of the common scenarios in the construction
industry. The purpose of this paper is to identify the primary causes of delays in the …
industry. The purpose of this paper is to identify the primary causes of delays in the …
An analysis on promoting prefabrication implementation in construction industry towards sustainability
As a game-changing technology with significant environmental, economic, and social
benefits, prefabricated technology has attracted attention and has been increasingly …
benefits, prefabricated technology has attracted attention and has been increasingly …
Factors affecting transaction costs and collaboration in projects
Purpose Transaction costs in projects can be reduced through improved collaboration
between contractors and clients. The purpose of this paper is to respond to the call for further …
between contractors and clients. The purpose of this paper is to respond to the call for further …
[HTML][HTML] Development of a real-time noise estimation model for construction sites
As construction noise negatively affects the health and quality of life of stakeholders, field
managers need to properly monitor and manage noise. Thus, the authors developed a …
managers need to properly monitor and manage noise. Thus, the authors developed a …