Turnitin
降AI改写
早检测系统
早降重系统
Turnitin-UK版
万方检测-期刊版
维普编辑部版
Grammarly检测
Paperpass检测
checkpass检测
PaperYY检测
A review on the geotechnical design and optimisation of ultra-long ore passes for deep mass mining
Enhancing mine energy efficiency and productivity necessitates the implementation of
longer ore passes, exceeding 300 m, to optimise material transport in underground mass …
longer ore passes, exceeding 300 m, to optimise material transport in underground mass …
A 2D discrete moisture diffusion model for simulating desiccation fracturing of soil
C Yan, Z Luo, Y Zheng, W Ke - Engineering Analysis with Boundary …, 2022 - Elsevier
The desiccation fracturing of soil is widespread, which affects the migration of rainwater in
the soil, and the stability of slopes or other projects. This paper proposes a simple two …
the soil, and the stability of slopes or other projects. This paper proposes a simple two …
A surrogate model based on deep convolutional neural networks for solving deformation caused by moisture diffusion
Z Luo, C Yan, W Ke, T Wang, M **ao - Engineering Analysis with Boundary …, 2023 - Elsevier
Moisture diffusion is a common phenomenon in geotechnical engineering, and its induced
deformation seriously affects the stability of the engineering structure, such as embankment …
deformation seriously affects the stability of the engineering structure, such as embankment …
Development and Application of a 3D GPU-parallelized CDEM for Blasting induced rock fractures
H Hu, L Yang, C Feng, J Huang, X Zhu - Simulation Modelling Practice and …, 2025 - Elsevier
The study has developed a three-dimensional, GPU-parallelized Continuum-Discontinuum
Element Method (CDEM) program, utilizing the CUDA C/C++ programming model on GPUs …
Element Method (CDEM) program, utilizing the CUDA C/C++ programming model on GPUs …
[PDF][PDF] A review on the geotechnical design and optimisation of ultralong ore passes for deep mass mining
T Stacey, EF Salmi, T Phan, EJ Sellers - wiredspace.wits.ac.za
Enhancing mine energy efficiency and productivity necessitates the implementation of
longer ore passes, exceeding 300 m, to optimise material transport in underground mass …
longer ore passes, exceeding 300 m, to optimise material transport in underground mass …