A survey of hybrid metaheuristics for the resource-constrained project scheduling problem

R Pellerin, N Perrier, F Berthaut - European Journal of Operational …, 2020 - Elsevier
Abstract The Resource-Constrained Project Scheduling Problem (RCPSP) is a general
problem in scheduling that has a wide variety of applications in manufacturing, production …

An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: The single mode case

RL Kadri, FF Boctor - European Journal of Operational Research, 2018 - Elsevier
In this article, we address the resource-constrained project scheduling problem with transfer
times (RCPSPTT). We assume that pre-emption is not allowed, and precedence relations …

Optimization modeling of multi-skilled resources in prefabrication: Theorizing cost analysis of process integration in off-site construction

M Arashpour, V Kamat, Y Bai, R Wakefield… - Automation in …, 2018 - Elsevier
In advanced manufacturing of building elements, process integration and utilization of multi-
skilled resources enhance the flexibility of production networks against variations in demand …

[HTML][HTML] Scheduling optimization of prefabricated construction projects by genetic algorithm

L **e, Y Chen, R Chang - Applied Sciences, 2021 - mdpi.com
Prefabricated buildings are the direction of the future development of the construction
industry and have received widespread attention. The effective execution of prefabricated …

Solving resource-constrained project scheduling problem via genetic algorithm

J Liu, Y Liu, Y Shi, J Li - Journal of Computing in Civil Engineering, 2020 - ascelibrary.org
The resource-constrained project scheduling problem (RCPSP) is an important and
challenging problem in the field of construction management. This paper presents a genetic …

A neurogenetic approach for the resource-constrained project scheduling problem

A Agarwal, S Colak, S Erenguc - Computers & operations research, 2011 - Elsevier
A variety of metaheuristic approaches have emerged in recent years for solving the resource-
constrained project scheduling problem (RCPSP), a well-known NP-hard problem in …

An efficient hybrid algorithm for resource-constrained project scheduling

W Chen, Y Shi, H Teng, X Lan, L Hu - Information Sciences, 2010 - Elsevier
We propose an efficient hybrid algorithm, known as ACOSS, for solving resource-
constrained project scheduling problems (RCPSP) in real-time. The ACOSS algorithm …

A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem

R Zamani - European journal of operational research, 2013 - Elsevier
This paper presents a genetic algorithm for solving the resource-constrained project
scheduling problem. The innovative component of the algorithm is the use of a magnet …

Teaching–learning-based optimization algorithm for multi-skill resource constrained project scheduling problem

H Zheng, L Wang, X Zheng - Soft Computing, 2017 - Springer
In this paper, a teaching–learning-based optimization algorithm (TLBO) is proposed to solve
the multi-skill resource constrained project scheduling problem (MS-RCPSP) with makespan …

Analysis of disruptions caused by construction field rework on productivity in residential projects

M Arashpour, R Wakefield, N Blismas… - Journal of construction …, 2014 - ascelibrary.org
Operational performance in residential construction production systems is assessed based
on measures such as average house-completion time, number of houses under …