A review of construction management challenges and BIM-based solutions: perspectives from the schedule, cost, quality, and safety management

M Parsamehr, US Perera, TC Dodanwala… - Asian Journal of Civil …, 2023 - Springer
Efficient project delivery in the context of contemporary construction management is
dependent on large volumes of data. However, due to pertinent challenges underlying …

Beyond the third dimension of BIM: A systematic review of literature and assessment of professional views

R Charef, H Alaka, S Emmitt - Journal of Building Engineering, 2018 - Elsevier
Across the world, the use of Building Information Modelling (BIM) and the three-dimensional
(3D) model in projects are increasingly frequent for supporting design tasks. The digital data …

Construction 4.0

A Sawhney, M Riley, J Irizarry… - Sawhney, A., Riley, M …, 2020 - api.taylorfrancis.com
With the pervasive use of Building Information Modelling (BIM), lean principles, digital
technologies, and offsite construction, the industry is at the cusp of this transformation. The …

Site logistics planning and control for engineer-to-order prefabricated building systems using BIM 4D modeling

R Bortolini, CT Formoso, DD Viana - Automation in Construction, 2019 - Elsevier
There has been a growing demand for engineer-to-order (ETO) prefabricated building
systems, in which a unique product must fulfill the requirements of specific clients. Although …

Building information modeling and safety management: A systematic review

MD Martínez-Aires, M López-Alonso, M Martínez-Rojas - Safety science, 2018 - Elsevier
Abstract Occupational Health and Safety (OHS) in building construction remains a
worldwide problem in terms of workplace injury, illness and fatality statistics. Construction …

BIM-based 4D mobile crane simulation and onsite operation management

AN Tak, H Taghaddos, A Mousaei, A Bolourani… - Automation in …, 2021 - Elsevier
Heavy industrial construction, particularly when modularization is adopted, requires
thorough heavy-lift studies to manage the extensive use of mobile cranes in congested and …

[HTML][HTML] The creation of construction schedules in 4D BIM: A comparison of conventional and automated approaches

O Doukari, B Seck, D Greenwood - Buildings, 2022 - mdpi.com
Building Information Modelling (BIM) is now a globally recognised phenomenon, though its
adoption remains inconsistent and variable between and within the construction sectors of …

Development of workspace conflict visualization system using 4D object of work schedule

HS Moon, N Dawood, LS Kang - Advanced Engineering Informatics, 2014 - Elsevier
Generally, workspace conflict analysis between construction activities by a 3D or 4D CAD
system is performed for checking the conflict between element bodies. However, in case of …

Estimating and visualizing the exposure to tower crane operation hazards on construction sites

S Hu, Y Fang, R Moehler - Safety science, 2023 - Elsevier
As an increasing number of building components are modularized and prefabricated, tower
cranes are required to lift larger and heavier loads. This situation increased the risk of crane …

4D BIM for environmental planning and management

J Jupp - Procedia engineering, 2017 - Elsevier
For more than a decade research has shown that 4D Building Information Modelling (BIM)
can improve construction planning, scheduling and production control as well as the onsite …