Project scheduling for constructing biogas plant using critical path method

S Zareei - Renewable and Sustainable Energy Reviews, 2018 - Elsevier
Population growth and technological progress have led to increased energy demand. While
fossil fuels are currently the main energy resources, they are limited and their combustion …

Project scheduling and monitoring: current research status

V Ahuja, V Thiruvengadam - Construction Innovation, 2004 - emerald.com
Project scheduling/rescheduling occurs in all stages of projects, from feasibility stage to
monitoring stage to completion. Since the late 1950s, network‐based techniques CPM …

[HTML][HTML] Dynamic networks for resilience-driven management of infrastructure projects

A Gondia, M Ezzeldin, W El-Dakhakhni - Automation in Construction, 2022 - Elsevier
The importance of ensuring the resilience (rapid adaptation to and recovery from
disruptions) of infrastructure projects in modern societies can be hardly overstated …

Constructability: Outline of past, present, and future research

D Kifokeris, Y Xenidis - Journal of Construction Engineering and …, 2017 - ascelibrary.org
Constructability has been researched for the last five decades, along with relevant
connotations such as buildability and constructability programs. Definitions and concepts …

Intelligent data-driven approach for enhancing preliminary resource planning in industrial construction

L Wu, W Ji, B Feng, U Hermann, S AbouRizk - Automation in Construction, 2021 - Elsevier
Industrial construction is often fast-tracked, with engineering and construction phases
progressing simultaneously. In contrast to projects where detailed engineering information is …

Functionality as a key concept for integrated project planning and scheduling methods

M Sheikhkhoshkar, H Bril El-Haouzi… - Journal of …, 2023 - ascelibrary.org
The construction industry has made significant efforts to address the issues of low
productivity caused by inefficient construction planning and scheduling. This issue led to …

Bayesian inference with Markov chain Monte Carlo–based numerical approach for input model updating

L Wu, W Ji, SM AbouRizk - Journal of Computing in Civil …, 2020 - ascelibrary.org
Stochastic, discrete-event simulation modeling has emerged as a useful tool for facilitating
decision making in construction. Owing to the rigidity inherent to distribution-based inputs …

Automated statistical analysis in stochastic project scheduling simulation

DE Lee, D Arditi - Journal of Construction Engineering and …, 2006 - ascelibrary.org
This paper describes a stochastic simulation-based scheduling system (S3) that:(1)
integrates the deterministic critical path method (CPM), the probabilistic program evaluation …

[HTML][HTML] RPERT: Repetitive-projects evaluation and review technique

RF Aziz - Alexandria Engineering Journal, 2014 - Elsevier
Estimating expected completion probability of any repetitive construction project with a
specified/certain duration including repetitive identical activities by using program evaluation …

Accounting for variability: Identifying critical activities as a supplement to the critical path

D Salhab, DE Møller, SM Lindhard… - Journal of …, 2022 - ascelibrary.org
Successful realization of construction activities requires simultaneous integration of various
resource input flows, giving rise to considerable sources of flow variability. Such variability …