[HTML][HTML] Resource-constrained multi-project scheduling problem: A survey

MG Sánchez, E Lalla-Ruiz, AF Gil, C Castro… - European Journal of …, 2023 - Elsevier
Project Management is becoming increasingly crucial in competitive environments such as
manufacturing and the service industries. The Resource-Constrained Multi-Project …

Efficient optimization of robust project scheduling for industry 4.0: A hybrid approach based on machine learning and meta-heuristic algorithms

A Goli - International Journal of Production Economics, 2024 - Elsevier
This research contributes significantly to the domain of Industry 4.0 by offering a nuanced
approach to the multi-objective optimization of the resource-constrained project scheduling …

Critical chain based Proactive-Reactive scheduling for Resource-Constrained project scheduling under uncertainty

W Peng, X Lin, H Li - Expert Systems with Applications, 2023 - Elsevier
Project scheduling problems under both resource constraints and uncertainty have been
widely studied due to their real world relevance. In this paper, we design and implement a …

[HTML][HTML] Hybrid differential evolution algorithm for the resource constrained project scheduling problem with a flexible project structure and consumption and …

T Van der Beek, D Souravlias, JT van Essen… - European Journal of …, 2024 - Elsevier
The resource constrained project scheduling problem with a flexible project structure and
consumption and production of resources, involves making a selection of activities and …

A reinforcement learning based multi-method approach for stochastic resource constrained project scheduling problems

KM Sallam, RK Chakrabortty, MJ Ryan - Expert Systems with Applications, 2021 - Elsevier
Abstract The Resource-Constrained Project Scheduling Problem (RCPSP) has been widely
accepted as a challenging research topic due to its NP-hard nature. Because of the dynamic …

New closed-loop approximate dynamic programming for solving stochastic decentralized multi-project scheduling problem with resource transfers

S Zhao, Z Xu - Expert Systems with Applications, 2021 - Elsevier
Resource transfers and uncertain activity durations are two practical factors that are difficult
to cope with in real project management. This paper studies a new decentralized multi …

A two‐layer approach for solving robust decentralized multiproject scheduling problem with multi‐skilled staff

W You, Z Xu, Y Yu, S Zhao - International Transactions in …, 2024 - Wiley Online Library
Uncertain activity durations and multi‐skilled staff allocation are two practical factors that are
difficult to cope with in real project management. This paper studies a new decentralized …

Co-evolution genetic programming-based hyper-heuristics for the stochastic project scheduling problem with resource transfer and idle costs

H Zhang, L Li, S Bai, J Zhang - Swarm and Evolutionary Computation, 2024 - Elsevier
In this paper, we study the stochastic resource-constrained project scheduling problem with
transfer and idle costs (SRCPSP-TIC) under uncertain environments, where the resource …

Prediction of multiproject resource conflict risk via an artificial neural network

L Bai, Z Wang, H Wang, N Huang, H Shi - Engineering, Construction …, 2021 - emerald.com
Purpose Inadequate balancing of resources often results in resource conflict in the
multiproject management process. Past research has focused on how to allocate a small …

A two-stage algorithm based on 12 priority rules for the stochastic distributed resource-constrained multi-project scheduling problem with multi-skilled staff

Y Yu, Z Xu, S Zhao - IEEE Access, 2023 - ieeexplore.ieee.org
In practical multi-skilled resource-constrained multi-project management, the activity
duration is often affected by some factors (eg, rework, increased workload), leading to …