Project Risk in the Context of Construction Schedules—Combined Monte Carlo Simulation and Time at Risk (TaR) Approach: Insights from the Fort Bema Housing …
In this article, we present our own construction process model consisting of 16 stages and
eight phases, which is particularly applicable to large investment projects. In the context of …
eight phases, which is particularly applicable to large investment projects. In the context of …
Scheduling repetitive construction projects: Structured literature review
Construction projects that involve repetitive operations are often referred to as repetitive
construction projects. Scheduling them proves a task more demanding than in the case of …
construction projects. Scheduling them proves a task more demanding than in the case of …
Delay risk assessment of repetitive construction projects using line-of-balance scheduling and Monte Carlo simulation
Although the line-of-balance (LOB) method is widely used for the scheduling of repetitive
construction projects, there are only a limited number of studies that deal with the issue of …
construction projects, there are only a limited number of studies that deal with the issue of …
Improving workflow and resource usage in construction schedules through location-based management system (LBMS)
Abstract Critical Path Method (CPM), a planning and controlling technique, is widely used in
the construction industry. However, CPM is criticized for its lack of workflow and inability to …
the construction industry. However, CPM is criticized for its lack of workflow and inability to …
A community detection approach for the resource leveling problem in a multi-project scheduling environment
A Sayyadi, H Esmaeeli, AH Hosseinian - Computers & Industrial …, 2022 - Elsevier
This paper develops an integrated mathematical formulation that embraces the Resource
Leveling Problem (RLP) and the Multi-Project Scheduling Problem (MPSP). To incorporate …
Leveling Problem (RLP) and the Multi-Project Scheduling Problem (MPSP). To incorporate …
A constraint programming approach for scheduling repetitive projects with atypical activities considering soft logic
X Zou, L Zhang - Automation in Construction, 2020 - Elsevier
Repetitive projects are characterized by a set of activities that need to be repeated in several
units. Optimizing the work sequence between each activity in different units is essential to …
units. Optimizing the work sequence between each activity in different units is essential to …
Multiobjective robust optimization model for generating stable and makespan-protective repetitive schedules
Q Cao, X Zou, L Zhang - Journal of construction Engineering and …, 2022 - ascelibrary.org
Construction projects often face various uncertainties during their execution. Even if planned
project schedules are optimal with respect to time or cost, their implementation may be …
project schedules are optimal with respect to time or cost, their implementation may be …
Optimizing the scheduling of repetitive construction to minimize interruption cost
This paper presents the development of a novel optimization model for the scheduling of
repetitive construction projects. The model provides original and unique capabilities that …
repetitive construction projects. The model provides original and unique capabilities that …
Scheduling optimization of linear schedule with constraint programming
Y Tang, R Liu, F Wang, Q Sun… - Computer‐Aided Civil …, 2018 - Wiley Online Library
In recent decades, construction project scheduling optimization has received extensive
attention from the research community. However, the most commonly used scheduling …
attention from the research community. However, the most commonly used scheduling …
Linear scheduling with multiple crews based on line-of-balance and productivity scheduling method with singularity functions
Scheduling repetitive work by multiple crews is a typical mission for schedulers, who must
arrange the productivity, number, and size of crews and their lead or lag. Currently, the …
arrange the productivity, number, and size of crews and their lead or lag. Currently, the …