Time-cost optimization of construction projects with generalized activity constraints
AP Chassiakos, SP Sakellaropoulos - Journal of Construction …, 2005 - ascelibrary.org
Time-cost analysis is an important element of project scheduling, especially for lengthy and
costly construction projects, as it evaluates alternative schedules and establishes an …
costly construction projects, as it evaluates alternative schedules and establishes an …
Application of classic and novel metaheuristic algorithms in a BIM-based resource Tradeoff in dam projects
In recent years, dam construction has become more complex, requiring an effective project
management method. Building Information Modeling (BIM) affects how construction projects …
management method. Building Information Modeling (BIM) affects how construction projects …
Project time–cost analysis under generalised precedence relations
S Sakellaropoulos, AP Chassiakos - Advances in Engineering Software, 2004 - Elsevier
Existing methods dealing with the time–cost trade-off problem, which is encountered in
project planning, have focused on the solution of a basic problem that does not adequately …
project planning, have focused on the solution of a basic problem that does not adequately …
Project scheduling by integration of time cost trade-off and constrained resource scheduling
Project managers today rely on scheduling tools based on project network techniques like
Critical Path Method (CPM) to determine the overall project duration and the activities float …
Critical Path Method (CPM) to determine the overall project duration and the activities float …
Construction scheduling using critical path analysis with separate time segments
W Menesi - 2010 - uwspace.uwaterloo.ca
Project managers today rely on scheduling tools based on the Critical Path Method (CPM) to
determine the overall project duration and the activities' float times. Such data provide …
determine the overall project duration and the activities' float times. Such data provide …
Whale Optimization Algorithm (WOA) for BIM-based resource trade-off in construction project scheduling
In the construction industry, project managers ought to balance various resources due to
their limitations while considering the projects' time, cost, risk, quality, and environmental …
their limitations while considering the projects' time, cost, risk, quality, and environmental …
BIM-based resource trade-off in dam project scheduling using Atomic Orbital Search (AOS) algorithm
M Baghalzadeh Shishehgarkhaneh… - AUT Journal of Civil …, 2023 - ajce.aut.ac.ir
Dam construction projects are considered complicated, large, and heavy projects throughout
the world, requiring a high number of workers, stakeholders, equipment, cost, and time …
the world, requiring a high number of workers, stakeholders, equipment, cost, and time …
A hybrid soft computing technique by using fuzzy Petri nets to optimise the critical path in management problem
The success or failure of any project significantly depends on the effectiveness of project
scheduling and meticulous planning. Inadequate scheduling has the potential to adversely …
scheduling and meticulous planning. Inadequate scheduling has the potential to adversely …
A multi-objective stochastic programming approach for project time, cost and quality trade-off problem (TCQTP)
Generally, in project time, cost and quality trade-off problems, the decision maker (DM) has
to take different conflicting objectives into account in order to find an optimal solution. In …
to take different conflicting objectives into account in order to find an optimal solution. In …
[PDF][PDF] BIM-based resource trade-off in dam project scheduling using Atomic Orbital Search (AOS) algorithm
MB Shishehgarkhaneh, SF Moradinia, A Keivani… - researchgate.net
Dam construction projects are considered as complicated, large, and heavy projects
throughout the world, requiring high number of workers, stakeholders, equipment, cost, and …
throughout the world, requiring high number of workers, stakeholders, equipment, cost, and …