Uncertainties in the resource conservation problems: a review

D Arya, S Bandyopadhyay - Clean Technologies and Environmental …, 2022 - Springer
Process integration, which started its development in the early 1970s, is an emerging branch
of study for conserving various resources. Process integration studies the interdependencies …

[HTML][HTML] Optimal components assignment problem for a flow network with node failure using fuzzy optimization

MR Hassan, H Hamdy, S Alkhalaf, AMB Eldin… - Ain Shams Engineering …, 2022 - Elsevier
The optimal components assignment problem in a flow network with node failure in the
presence of system reliability and total lead-time constraints is studied in this paper. By …

Design, optimisation and reliability allocation for energy systems based on equipment function and operating capacity

V Andiappan, MFD Benjamin, RR Tan, DKS Ng - Heliyon, 2019 - cell.com
Designers of energy systems often face challenges in balancing the trade-off between cost
and reliability. In literature, several papers have presented mathematical models for …

Solving optimal components assignment problem for a multistate network using fuzzy optimization

H Hamdy, MR Hassan, M Eid… - International Journal of …, 2019 - papers.ssrn.com
Optimal components assignment problem subject to system reliability, total lead-time, and
total cost constraints is studied in this paper. The problem is formulated as fuzzy linear …

Optimal Sizing of a Trigeneration Plant Integrated with Total Site System Considering Multi-period and Energy Losses

K Jamaluddin, SRW Alwi, Z Abd Manan… - E3S Web of …, 2021 - e3s-conferences.org
Rising awareness for the environment as well as concerns over the sustainability of fossil
fuels has encouraged developed and develo** countries to find alternative ways to …

Maximizing Reliability of Two-Commodity Flow Networks with Time Constraint Using Fuzzy Optimization

AM Hemeida, MR Hassan… - Aswan University Journal …, 2022 - aujst.journals.ekb.eg
The main objective of this paper is to study the optimal components assignment problem for
a two-commodity flow network via disjoint minimal paths in the existence of system reliability …

Evaluation of the integration of recycling unit in an iron manufacturing plant

E Arriola, IHV Gue, AT Ubando… - IOP Conference Series …, 2021 - iopscience.iop.org
Manufacturing of new steel from virgin iron ore is not only an energy intensive process but
also generates a considerable amount of annual carbon footprint with respect to the world's …