[HTML][HTML] The impact of COVID-19 on offshore wind project productivity–A case study

J Lerche, S Lorentzen, P Enevoldsen… - … and Sustainable Energy …, 2022 - Elsevier
This study investigated productivity in an offshore wind project to understand the distribution
of their value-adding and non-value-adding hours. A comprehensive literature review …

Application of last planner system to modular offshore wind construction

J Lerche, HH Neve, G Ballard, J Teizer… - Journal of …, 2020 - ascelibrary.org
The focus of this study is the applicability of the Last Planner System (LPS) to modular
offshore wind construction. Following a design science approach, a conceptual model for …

A mixed-method optimisation and simulation framework for supporting logistical decisions during offshore wind farm installations

E Barlow, DT Öztürk, M Revie, K Akartunalı… - European Journal of …, 2018 - Elsevier
With a typical investment in excess of£ 100 million for each project, the installation phase of
offshore wind farms (OWFs) is an area where substantial cost-reductions can be achieved; …

Causes of delay in offshore wind turbine construction projects

J Lerche, S Lindhard, P Enevoldsen… - … Planning & Control, 2023 - Taylor & Francis
This research investigated the causes of delays in offshore wind projects, categorizing, and
ranking these factors using statistical analysis. The study presented was based on the …

[PDF][PDF] Continuous Improvements at Operator Level.

J Lerche, H Neve, S Wandahl, A Gross - Journal of Engineering …, 2020 - academia.edu
Few empirical studies have previously reported on the implementation of takt planning and
utilizing Deming cycles (PDCA) to control construction workflows continuously. This paper …

[PDF][PDF] Comparison of takt planning methods used on projects of different types

ID Tommelein, J Lerche - … of the 31st Annual Conference of the …, 2023 - academia.edu
Takt planning has been used to deliver projects of different types and in different industry
sectors. We presuppose here that the methods used to develop project takt plans therefore …

[HTML][HTML] Logistic Decisions in the Installation of Offshore Wind Farms: A Conceptual Framework

MOA González, G Nascimento, D Jones, N Akbari… - Energies, 2024 - mdpi.com
Offshore wind energy has achieved significant reductions in its levelized cost of energy
(LCoE) in the past decade, but still needs efficiency improvements. Approximately 18% of …

Why would location-based scheduling be applicable for offshore wind turbine construction?

J Lerche, O Seppänen, KB Pedersen… - Proceedings of the 27th …, 2019 - pure.au.dk
The focus in this research was the conversion of a traditional activity-based construction
schedule to a location-based schedule. The case investigated was an offshore wind turbine …

Improving logistics scheduling and operations to support offshore wind construction phase

S Chartron - Logistics Research, 2019 - econstor.eu
The increasing construction of offshore wind farms and the expected improved profitability
call for a better efficiency in offshore logistics. The purpose of this study is to propose …

Offshore wind project production system: Reducing construction duration through planning

J Lerche - 2020 - pure.au.dk
This thesis demonstrates the importance of understanding a production system, to increase
its productivity through preparation and planning. First categorizing the system, second …